1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
puteri [66]
2 years ago
10

A city councilwoman is concerned that the new contractor she hired is taking too long to replace defective streetlights. She wou

ld like to perform a hypothesis test to determine if the replacement time for streetlights under the new contractor is in fact longer than the replacement time under the previous contractor, which was 3.2 days on average. She selects a random sample of 12 streetlight service calls and obtains the following times to replacement (in days). Use a significance level of 0.05
6.2 7.15.4 5.57.52.6 4.3 2.9 3.7 0.7 5.6 1.7

Required:
a. Define μ in the context of the problem and state the appropriate hypotheses.
b. State and check the conditions for a hypothesis test of the mean. Since the sample size is smaller than 30, you will need to calculate a normal probability plot to determine if the data come from a normal distribution.
Mathematics
1 answer:
satela [25.4K]2 years ago
5 0

Answer:

There is significant evidence to conclude that the replacement time for streetlights under the new contractor is longer than the replacement time under the previous contractor.

Step-by-step explanation:

Given the data :

6.2 7.1 5.4 5.5 7.5 2.6 4.3 2.9 3.7 0.7 5.6 1.7

The hypothesis:

H0: μ = 3.2

H1 : μ > 3.2

n = sample size = 12

The sample mean, xbar = ΣX / n

xbar = 53.2 / 12

xbar = 4.43

Using calculator;

Sample standard deviation, s = 2.147

The test statistic :

(xbar - μ) ÷ (s/sqrt(n))

(4.43 - 3.2) ÷ (2.147/sqrt(12)

1.23 / 0.6197855

Test statistic = 1.985

The Pvalue using the Pvalue from Tscore calculator :

Tscore = 1.985 ; df = 12 - 1 = 11

Pvalue = 0.036

Since Pvalue < α ; We reject the Null

Hence, we conclude that the replacement time for streetlights under the new contractor is longer than the replacement time under the previous contractor.

You might be interested in
May someone please help me??
Mamont248 [21]

Answer:

4 movies and 2 commercials and half a commercial because 10 is left over

Step-by-step explanation:

please mark brainliest if right

5 0
3 years ago
Add. 4.29 + 97.2 + 0.687 =<br> 102.177<br> 140.787<br> 1,407.87<br> 1,021.77
nordsb [41]
4.29 + 97.2 + 0.687 = 102.177

In adding decimal numbers, make sure that the decimal points are aligned. Since each number has different counts of numbers after the decimal point, use 0 to pad the missing places.
    
      4.290
    97.200
   <u>   0.687
</u>  102.177

The count of numbers after the decimal point is the same count of number of the decimal who has the greatest count of number after the decimal point.

4.29 only has 2 counts of places after the decimal point
97.2 only has 1 count of place after the decimal point
0.687 has 3 counts of places after the decimal point. 

The sum of the decimals must also have 3 counts of places after the decimal point.

7 0
3 years ago
I need on help on this!
ElenaW [278]

The probability that the marble taken out is yellow is 1/4

Step-by-step explanation:

Total marbles = 12

Yellow marbles = 3

Probability that the marble taken out is yellow= No of yellow marbles/total marbles.

Probability that the marble taken out is yellow= 3/12

Probability that the marble taken out is yellow= 1/4

So, the Probability that the marble taken out is yellow is 1/4

Keywords: Probability

Learn more about Probability at:

  • brainly.com/question/4021035
  • brainly.com/question/4655616
  • brainly.com/question/6649771

#learnwithBrainly

7 0
3 years ago
In the ordered pair (2, 3), what is the x-coordinate? y-coordinate?
blagie [28]

Answer:

2 = x- coordinate

3 = y coordinate

Step-by-step explanation:

REMEMBER: In an ordered pair, the x-coordinate always comes first.

3 0
3 years ago
A student writes an incorrect step while checking if the sum of the measures of the two remote interior angles of triangle ABC b
blsea [12.9K]
The correct answer is A.  All triangles' interior angles equal 180.
5 0
3 years ago
Read 2 more answers
Other questions:
  • M(1, 7) is the midpoint of PQ¯¯¯¯¯ . The coordinates of point P are (−8, 3) .
    5·1 answer
  • This image shows a reconstruction of pyramid with a square base what is the best estimate for the volume of the pyramid
    12·2 answers
  • * WILL GIVE BRIANLIEST 5 QS PLZZ HELP MEH ;D*(07.01)What is the solution to the equation 5x = 40?
    8·1 answer
  • Factoring expressions: 17x-34xy
    15·2 answers
  • Susan purchased n notebooks. They were 4 dollars each. Write an equation to represent the total cost c that Susan paid
    12·1 answer
  • The time taken to complete a journey varies directly as the distance (d) and inversely as the average speed (s).
    14·1 answer
  • What’s 7/8 x 1/3 in simplest form
    15·2 answers
  • 1000 go into 3 how many times
    13·2 answers
  • An altitude is drawn from the vertex of an isosceles triangle, forming a right angle and two congruent triangles. As a result, t
    7·1 answer
  • On the coordinate plane, the x-axis and y-axis are<br> to each other.
    13·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!