To best emphasize the number of defects. Manager should use graph 3 (refer the image shown):
If we talk about graph 1, it can also be used but usually we put the time line on the horizontal axis, for the convenience and the quantity to be measured on the y-axis. In the graph 1, the time is placed on the vertical axis (x-axis) so it would not be a good pick for the manager.
Same is the case with graph 2 again we have time on the vertical axis. So it is not a good idea to with graph 2.
Graph 3 could be the best to emphasize the number of defects because first of all time is placed on the horizontal axis and the quantity to be shown is on the vertical axis. Secondly, the range of the vertical axis is less so it is easy to observe the data set on the graph quite distinctively. Therefore, graph 3 is the best pick.
Graph 4 is placed correctly in terms of vertical and horizontal axes but the range of vertical axis is quite high due to which the dispersion or the display of the data is quite compressed and it gets hard to visualize.
Company A pays $5500 more than B in year 10
Idk
At least 20 characters to explain it well.
Side AB is 72 cm long.
Explanation:
To find the length of side AB you have to use this formula:

*Remember there are two legs (a and b) and a hypotenuse (c) on a triangle. The longest side will be the hypotenuse and the other two will be the legs. For this triangle the hypotenuse is side BC while the legs are sides CA and side AB.
Plug in the numbers into the equation.

For this triangle, you were given the hypotenuse (c) and one leg (a). To find the last length solve the equation and balance it so only b is left, like this:


Soo...

Then to get the side length, square root 5184.

So the length of the last side is 72 cm.