Answer:
Scrap
Explanation:
The scrap material is that material that is not usable for the or the services are no longer available and these products are not used so far for the production process. It is totally and completely discarded and used as a by product production process
Hence, the correct option is scrap
And all other options are wrong and incorrect
Answer:
$4,424
Explanation:
Calculation for her employer's after-tax cost of providing the health insurance
Using this formula
After-tax cost =Annually employer's cost of health insurance -(=Annually employer's cost of health insurance*Marginal tax rate)
Let plug in the formula
After-tax cost =$5,600- ($5,600 × 21%)
After-tax cost =$5,600- $1,176
After-tax cost =$4,424
Therefore her employer's after-tax cost of providing the health insurance is $4,424
<span>Someone may choose to own a car instead of leasing because they may end up needing to drive it farther and longer than the set milage or wanting to own the vehicle outright instead of making lease or rental payments. If you damage the vehicle, it also becomes more expensive because you do not own it entirely. Reporting damage or mile overage to the leasing company results in fees and penalities. </span>
Answer:
$778460
Explanation:
Using the highlow method, we calculate the variable cost per unit,
- VC / unit = 855460 - 651960 / 730000 - 545000 = $1.1per unit
- The total fixed cost will be = 855460 - (1.1 * 730000) = $52460
The cost estimating equation will be,
- Total cost at x number of unit = 1.1x + 52460
The cost of manufacturing supplies for the month of July will be,
- Total cost (July) = 1.1(660000) + 52460 = $778460