You multiply 55.25 by 0.18. You get 9.945 and then you add it to 55.25. You should get 65.195. Round it to $65.20. That's your answer.
Lines b and c
they both go up 2 and over 1 (rise over run is slope)
The answer would be (-1,-6). Remember that the x-axis runs left to right and the y-axis runs up and down. Therefore, if you were to reflect it, just picture it being flipped over. If you go from (-1,+6) and you reflect it over the x-axis, both points are now in the bottom left quadrant where everything is negative. So, you get (-1,-6) The -1 doesn't change since it was already a -x value before and stayed in a negative area.
The answer is B.
The total hours worked is 5 x 8 teams is 40 hours x 2 cars per hour is 80 cars.
$600/80= $7.50 per car
Answer:
The Answer is C hope this helps!
Step-by-step explanation: