Step-by-step explanation:
the correct answer is A ...
3*4+1 =13/3 ÷ -5/6
$3,958
explanation:
47,000 / 12 months = 3,958
Answer:
Step-by-step explanation:
(5)^
2×
Their are 6 equilateral triangles in a regular hexagon:
The area of one triangle = (x²√3)/4, then:
1st answer: The area of the hexagon base: is 6 TIMES the area of one equilateral triangle [or, needed for 2nd, question, TOT AREA:(6x²√3)/4] = (3x²√3)/2] unit²
2nd answer: :
Volume of pyramid: (base area)(height)/3
Volume of pyramid: (3x²√3).(3x)/3 (because height = 3x, given)
Then Volume of pyramid= 3x³√3 unit³.
3 is the answer for the second question
and 6 for the 1st
Answer:
<h2>2.5 hours</h2>
Step-by-step explanation:
Step one:
given data
for train one
speed= 50miles per hour
for train two
speed= 60miles per hour
the total distance between both trains=275miles
Step two:
the expression for speed= distance/time
so that, distance= speed*time
let the time be t
we are going to combine both distances
train one distance =50t
train two distance =60t
Hence total distance
50t+60t=275
110t=1=275
t=275/110
t=2.5 hours
<u>It will take 2.5 hours</u>