If George completed 3/5 of work in 9 days, it means that he needs 3 days to finish 1/5th of the work.
The remaining part is 2/5 because 1-3/5=2/5. 2/5 is also 6/15
From this, how much did George do? in the first 3 days he did 1/5th and then one more day was left, during which he did 1/5/3=1/15th.
So he did in total 1/15+1/5=1/15+3/15=4/15.
this means that Paul did the rest of 6/15, so Paul did 6/15-4/15=2/15.
So we know that he does 2/15 in 4 days, which means that every two days he can do 1/15 of the work
so he would need 15 times 2 days to finish the work - 30 days!
<span> Slope = 1.000/2.000 = 0.500 x-intercept = 5/-1 = -5.00000<span> y-intercept = 5/2 = 2.50000</span></span>
5(a + 3b) = 5(9 + 3(2)) = 5(9 + 6) = 5(15) = 75
4/5 is the answer.
The formula is y=mx+b, where m is the slope
The answer is 4x + 5y.
Here, what needs to be done is to combine like terms.
- 5x + 4y + 3x - 7y - 4x + 8y
- 5x + 3x - 4x + 4y + 8y - 7y
- 4x + 5y