1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Helen [10]
3 years ago
10

Yaro buys a baseball cap for $9.50. He also buys a new baseball. Yaro speads $13.50 altogether.

Mathematics
1 answer:
VMariaS [17]3 years ago
4 0

Answer:

13.5 = 9.5 + x

x=4

Step-by-step explanation:

In this problem, the price of the baseball cap, which is $9.50, and a baseball, whose price is unknown (and therefore must be the variable), total $13.50. So, to set up the equation add the two prices and set them equal to the total, 9.5+x=13.5.

Then, using the subtraction property of equality subtract 9.5 from both sides. This means x=4, so the baseball cost 4 dollars.

You might be interested in
What is the simplified expression for 6(2(y+x))?
koban [17]
It should be B I know how to do it
5 0
3 years ago
Read 2 more answers
A line intersects the points (-14,-10) and (7,5). find the slope of the line and simplify
Tpy6a [65]
The slope of any line can be calculated using the following rule:
slope = (y2-y1) / (x2-x1)

The given points are (-14,-10) and (7,5), therefore:
y2 = 5
y1 = -10
x2 = 7
x1 = -14

Substitute with these values to get the value of the slope as follows:
slope = (5--10) / (7--14) = 5/7
5 0
3 years ago
Work out the reciprocal of 0.4
Bond [772]

Answer:

1/0.4=10/4=5/2...............

4 0
3 years ago
Read 2 more answers
An iPhone costs 7 times as much as an AirPods. Together they cost $1,200. Find the price of the laptop and iPod.
Mrac [35]

Answer:

Airpods=$150 iPhone=1050

Step-by-step explanation:

$1,200/8=150 150*7=1050

I might be wrong tho

4 0
3 years ago
There are four activities on the critical path, and they have standard deviations of 1, 2, 4, and 2. what is the probability tha
Sauron [17]
The expected completion time is μ = 40 weeks.
The random variable, X = 38 weeks (the probable time)

If the standard deviation is σ, then the z-score is z = (x - μ)/σ.

Let us test the given standard deviations.
When σ=1,
z = (38-40)/1 = -2
From standard tables,
P(x<=38) = P(z<=-2) = 0.0228 =2.3%

When σ=2,
z = (38*40)/2 = -1
P(x<=38) = P(z<=-1) = 0.1587 = 15.9%

When σ=4,
z = (38-40)/4 = -0.5
P(x<=38) = P(z<=-0.5) = 0.3085 = 30.9%

Answers:
z=1 => 2.3%
z=2 => 16% (approx)
z=4 => 31% (approx)

7 0
3 years ago
Other questions:
  • How much is 8 hundreds plus 3 tens
    11·2 answers
  • Can someone explain the steps to solve number two?
    6·1 answer
  • Using fermat's little theorem, find the least positive residue of $2^{1000000}$ modulo 17.
    8·1 answer
  • Is 7/12 bigger than 1/2
    9·2 answers
  • Can someone please help me answer this ​
    13·1 answer
  • If r(x)=3x-1 and s(x)=2x+1, which expression is equivalent to (r/s)(6)
    15·1 answer
  • If f(x) = 2x + 1, then f(3) = ?
    11·2 answers
  • Solve for x.
    8·1 answer
  • Un grupo de alumnos para su viaje de estudios contrata un autobús a precio fijo. Inicialmente iban al viaje 30 alumnos siendo el
    15·1 answer
  • Which of the following are valid probability distributions?
    12·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!