Since "p" represents the number of pounds of peanuts and:
4.05p + 14.40 = 4.50(p + 3) [then by distributing we have:
4.05p + 14.40 = 4.50p + 13.5 [then by subtracting 13.5 from both sides we have:
4.05p + 0.9 = 4.50p [then by subtracting 4.05p from both sides we have:
0.9 = 0.45p [then by dividing both sides by 0.45 we have:
2 = p
So there are 2 pounds of peanuts needed for the trail mix.
Answer:
$1200 interest
Step-by-step explanation:
$30,000 divided by 100 = 300 , 300 multipled by 4 = 1200 , thats how to find what 4% would be

Let's solve :
a.) The equation will be :
b.) the table will be like this :
point (1 , -3)
point (3, -1)
point (-1 , 3)
point (-3 , 1)
c.) graph the equation as shown in attachment !
Answer:
<u>(2) x </u>
<u> 4</u>
Step-by-step explanation:
Given the sqrt(x), x
zero
So, given sqrt(x -4), x -4
0
Now solve for x
x - 4
0
x
4