9514 1404 393
Answer:
c. $20.23
Step-by-step explanation:
The overhead cost per labor hour is found by dividing overhead costs by labor hours:
$163,900/(8100 h) = $20.23 /h
The factory overhead rate is $20.23 per labor hour.
Answer:
C
Step-by-step explanation:
The first part requires the intersection of the two sets, which means only the elements that can be found in both sets.
While the second part requires all the elements in both the sets.
The slope is 0.5
In an equation it would be 0.5x
Answer:
6x
Step-by-step explanation:
7x - x
X by itself is the same thing as 1x.
So, if we rewrite the equation using 1x instead of just x:
7x - 1x
Now, we can subtract like we normally would.
7x - 1x = 6x