0 is the answer! that is because 62 is also the mean.
To determine the number of days that an employee work in a week, we simply use dimensional analysis and multiplying the number of works per week with the number of weeks in total for a year. That is,
employee works = (5 days per week)(49 weeks per year)
=245 days
If the length is 7/6 the width w then the perimeter is w + (7/6)w + w + (7/6w)
= 2((7/6)w + w) = 2w + (14/6)w = (26/6)w = (13/3)w.
So the answer is the last one.
Answer:
I think 3 ............................three