Answer:
(0,1) and (-2,9)
Step-by-step explanation:
A point (x,y) lies on the graph of f(x) =
if it satisfies the condition y = 
<h3>
(0,1):</h3>
x = 0 and y = 1.
This point satisfies the required condition as
= 1
Hence, this point <u>is</u> on the graph of f(x) = 
<h3>
(3,27):</h3>
x = 3 and y = 27.
This point doesn't satisfy the required condition as
=
≠ 27
Hence, this point i<u>s not</u> on the graph of f(x) = 
<h3>
(-2,9):</h3>
x = -2 and y = 9.
This point satisfies the required condition as
=
= 9
Hence, this point <u>is</u> on the graph of f(x) = 
<h3>
(-1,
):</h3>
x = -1 and y =
.
This point satisfies the required condition as
y =
=
= 3 ≠ 
Hence, this point <u>is not</u> on the graph of f(x) = 
Answer:
Step-by-step explanation:
Sum of exterior angles of any polygon =360°
Sum of exterior angles of polygon = 360°
m + 5 + 2m + 3 + 3m + 2 + 4m + 1 + 5m + 4 = 360
m + 2m + 3m + 4m + 5m + 5 + 3 + 2 + 1 + 4 = 360 {Combine like terms}
15m + 15 = 360 {Subtract 15 from both sides}
15m = 360 - 15
15m = 345 {Divide both sides by 15}
m = 345/15
m = 23
m + 5 = 23 + 5 = 28°
2m + 3 = 2*23 + 3 = 46 + 3 = 49°
3m + 2 = 3*23 + 2 = 69 + 2 = 71°
4m + 1 = 4*23 + 1 = 92 + 1 = 93°
5m + 4 = 5*23 + 4 = 115 + 4 = 119°
Answer:
Step-by-step explanation:
You can't see the diagram for 27. We do not know what the entire question consists of.
26
This is a calculator question. Your calcualator has a ^ or y^x or x^y key.
To solve this problem, use one of these keys.
225 y^x 0.5 = 15 There are two answers: - 15 and 15. The question only wants 15.
If you repost 27, I'll come back and do it.
Http://rss2search.com/nohost.php?url=www.edhelperblig.com/cgi-bin/socstud.cgi
Answer:
18 hours
Step-by-step explanation:
Let the volume of the pool be x. Since pipe A filled the pool in 6 hours, the rate of pipe A = x / 6.
Let the rate of pipe b be y, Hose A filled the pool alone for the first 2 hours, this means that the volume filled in the 2 hours is x/6(2 hours) and the two hoses, working together, then finished filling the pool in another 3 hours for the 3 hours the volume filled is x/6(3) + y(3). hence the total time is:
x/6(2) + x/6(3) + y(3) = x
x/3 + x/2 + 3y = x
Multiply through by 6:
2x + 3x + 18y = 6x
5x + 18y = 6x
18y = x
y = x/18
The rate of pipe B is x/18, this means it would take pipe B 18 hours to full the pool alone