Answer:
2.25x4.7=10.575
Multiply the amount required for one batch by the # of batches
Step-by-step explanation:
Because the difference between any term and the previous term is a constant, this is an arithmetic sequence because of that constant which is referred to as the common difference, d. Which in this case is -35--38=-32--35=3
Any arithmetic sequence can be expressed as:
a(n)=a+d(n-1), a=initial term, d=common difference, n=term number.
In this case a=-38 and d=3 so
a(n)=-38+3(n-1) which we can simplify to
a(n)=-38+3n-3
a(n)=3n-41, so the 52nd term is:
a(52)=3(52)-41
a(52)=156-41
a(52)=115
E) 12 minutes
A normal curve has approximately 95% of graph between mean - 2sd and mean + 2sd
So 95% of the times will be between 0 and 12 minutes. 6 - 2x3 to 6 + 2x3
2.5% will take over 12 minutes
Strangely 2.5% will also take less than 0 minutes to process which shows the normal curve is not perfect in this example.
Answer:
(3,-2)
Step-by-step explanation:
Below = a negative number (-)
-2
up = positive number
5
the equation would be -2+5 = ?
and the answer/ integer that represents the new location is 3