Answer:

General Formulas and Concepts:
<u>Pre-Algebra</u>
Order of Operations: BPEMDAS
- Brackets
- Parenthesis
- Exponents
- Multiplication
- Division
- Addition
- Subtraction
<u>Algebra I</u>
Terms/Coefficients
Step-by-step explanation:
<u>Step 1: Define</u>
<em>Identify.</em>
<em />
<em />
<em />
<em />
<em />
<u>Step 2: Find Combined Volume</u>
- [Set up] Add:

- Substitute in variables:

- Combine like terms:
Using the z-distribution, it is found that:
- The 95% confidence interval is of -1.38 to 1.38.
- The value of the sample mean difference is of 1.74, which falls outside the 95% confidence interval.
<h3>What is the z-distribution confidence interval?</h3>
The confidence interval is:

In which:
is the difference between the population means.
In this problem, we have a 95% confidence level, hence
, z is the value of Z that has a p-value of
, so the critical value is z = 1.96.
The estimate and the standard error are given by:

Hence the bounds of the interval are given by:


1.74 is outside the interval, hence:
- The 95% confidence interval is of -1.38 to 1.38.
- The value of the sample mean difference is of 1.74, which falls outside the 95% confidence interval.
More can be learned about the z-distribution at brainly.com/question/25890103
#SPJ2
40/120 = 0.33 repeating
or 33%
The original value of the sum is $131.1273...
Rounded up that is $131.13
PLEASE RATE AS THE BRAINLIEST ANSWER! THANK YOU! :)
It would be 50 because the 5 is in the tens spot