Answer:Production rate = 4.56 x 10³ bulbs/week
Production time = 9.36 x 10² weeks
Number of bulbs produced is
Answer: 4.27 x 10⁶ bulbs
Step-by-step explanation:
Answer:
The numbers are 35 and 28
35+28=65
35-28=7
Step-by-step explanation:
Brainliest?..
Answer:
254.34
Step-by-step explanation:
pie (3.14...) Radius(9) 9^2=81
3.14 times 81 is 254.34
Answer:
Option D is the correct answer - Estimation is best defined as a process of inferring the values of unknown samples statistics from those of known population parameters
Step-by-step explanation:
Estimation involves the usage of the value of a statistic derived from a sample to estimate the value of a corresponding population parameter.
The sample provides information that can be extended, through several formal or informal processes, to determine a range most suitable to describe the missing information.
An estimate that turns out to be incorrect would either be termed as over-estimation or under-estimation. If the estimate exceeds the actual result, it is termed as an over-estimation, and as an under-estimation, if the estimate came short of the actual result.
Thus, option D is correct.
Ok so the answer is super simple, its A