Answer:
5 bags of cement are required.
Step-by-step explanation:
Since to make concrete, the ratio of cement to sand is 1: 3, if cement and sand are sold in bags of equal mass, to determine how many bags of cement are required to make concrete using 15 bags of sand the following calculation must be done:
Cement = 1
Sand = 3
3 = 15
1 = X
15/3 = X
5 = X
Therefore, 5 bags of cement are required.
Ok so, we have the fact that 1.20 per mile Lets represent m as each additional mile so we have 1.20m which is That much per additional mile So For the first 5 functions we have f(1) = 20 f(2) = 20 f(3) = 20 f(4) = 20 f(5) = 20 Only for the first 5 miles though, since it is a flat fee. So for the additional miles we go back to what I said in the first Paragraph. 1.20m That is for additional miles, so that will be added to 20 So if you travel more than 5 miles the function looks like this: f(x) = 20 + 1.20m So the first 5 miles it is: f(x) = 20 For 7 mles the function would look like: f(7) = 20 + 1.20(2) It is a 2 because it is the additional mile, which is 2 hope this helps
Answer:
acute angles measure less than 90 degrees
HOPE THAT HELPS
8 is the median. If yo line up the numbers from least to greatest you will get 2,4,6,8,8,10,12 and the middle number is 8.