Total cost job=
Retail price of parts+labor cost+manufacturing overhead
Total cost job 82
Retail price of parts 0
Labor cost=7.5×6.5=48.75
Manufacturing overhead ?
82=0+48.75+?
?=82−48.75
?=33.25
Manufacturing overhead is 33.25
Now find manufacturing overhead rate from the cost of labor
33.25÷48.75=0.682×100=68.2%
The answer 68.2%
Option 4 is the answer.
50+30
=80
10(5+3)
= 10×8
=80
Hence, the correct option => 10(5+3)
Hope it helps!
8.8 because .78 rounded up is .8
Answer: A segment bisector, always passes through the midpoint of the segment and divides a segment in two equal parts. Points, lines, segments, and rays are all types of segment bisectors. If either a ray or a line serves as a segment bisector, it will be infinite.
Hello your very welcome :)