Answer:

Step-by-step explanation:
Let
h -----> the number of hours, Elon works during one 5-day work week
we know that

Elon’s break time must be equal to 1/2 of an hour multiplied by 5 days plus 1/5 multiplied by the total hours h
so

Solve for h
Multiply by 10 both sides to remove the fraction




First, let x be the number of hours it will take for Hector to finish the same job alone. This means that every hour, Hector can do 1/x of the job. The amount of work done by Shawn and Hector in 6 hours should be equal to 1 complete work. This can be expressed as,
(1/9 + 1/x)(6) = 1
The value of x is 18. Thus, Hector can to 1/18 of the job in one hour.
Answer:
y = 1/2x +6
Step-by-step explanation:
We have a point and a slope. Therefore we can use the point slope form to create a line
y-y1 = m(x-x1)
y-5 = 1/2(x--2)
y-5 = 1/2(x+2)
Distribute the 1/2
y-5 = 1/2x +1
Add 5 to each side
y-5+5 = 1/2x +1+5
y = 1/2x +6
This is in slope intercept form
Answer:
-3
Step-by-step explanation:
Please see attached picture for full solution.