Answer:
It takes 5 days to process an application.
Step-by-step explanation:
We have that number of requests per month would be equal 1600
Now, the applications in hand would be:
160 + 240 = 400
They tell us that everything must be in a number of 20 business days, therefore, the number of applications in one day would be:
1600/20 = 80
Which means that the time needed to finish an application is:
400/80 = 5 days
It takes 5 days to process an application.
Answer:
that the answer let me know if i am wrong hope this helps
Step-by-step explanation:
ANSWER. 77 adults; 2*77 = 154 children and the rest (315-77-154) = 84 students.
Answer:
-30w^5
Step-by-step explanation:
Answer:
Step-by-step explanation:
Part A: The pancake is a cylinder shape with a circular top and bottom and straight middle.
Part B: Rotating a circle will NOT make a cylinder. Instead rotating a rectangular around a vertical axis will. It is a rectangle of 1cm height and 7cm length rotating around an axis at its edge.**
**Thanks to Moderator wegnerkolmp2741o who pointed out that it has to be a rectangle of 1cm height and 7cm length rotating around an axis at its edge. My original option of 1cm height and 14cm length rotating around its center would cause an overlapping shape.