Answer:
The WIP limit is 0.50 days.
Step-by-step explanation:
The Computation of WIP limits:
to begin with, it is required to compute the process and procedure efficiency which will be computed as follows:
Value Added Time = 12 days (arriving time)
Non-Value-Added Time = 12 days (departure time)
Efficiency = Value Added / (Value Added + Non-Value Added)
= 12 / (12+12)
= 12 / 24
= 0.50 or 50%
the most obligatory throughput time will be 0.25 days to realize the profits
WIP limit = Throughput time / Efficiency
= 0.25 / 50%
= 0.50 days.
The WIP limit is 0.50 days.
Answer:
The answer is 25g^R4
Step-by-step explanation:
When you solve the equation, it becomes 25g^R4, it doesn't result in a whole number.
Circumference =
![2 \pi r](https://tex.z-dn.net/?f=2%20%5Cpi%20r)
When you plug that in you should have
![(2* \pi ) *3](https://tex.z-dn.net/?f=%282%2A%20%5Cpi%20%29%20%2A3)
Solve that and you have your answer(: I would recommend rounding to the nearest hundreth
The function y = x, called the "identity" or "ramp" function, is a basic function that you'll need to add to your math vocabulary. Since the " x " here seems to have no exponent, fix that by thinking "x^1," or "x to the first power," or "y=x is a linear function."
The graph of y=x always goes thru the origin. It begins in the 3rd quadrant and ends in the 1st, and appears as a straight line with slope of m = rise / run = 1/1 = 1.