1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
fenix001 [56]
3 years ago
12

Researchers measured the data speeds for a particular smartphone carrier at 50 airports. The highest speed measured was 72.6 Mbp

s. The complete list of 50 data speeds has a mean of x=18.55 Mbps and a standard deviation of s=19.69 Mbps. a. What is the difference between​ carrier's highest data speed and the mean of all 50 data​ speeds? b. How many standard deviations is that​ [the difference found in part​ (a)]? c. Convert the​ carrier's highest data speed to a z score. d. If we consider data speeds that convert to z scores between −2 and 2 to be neither significantly low nor significantly​ high, is the​ carrier's highest data speed​ significant?
Mathematics
1 answer:
Lapatulllka [165]3 years ago
8 0

Answer:

a. 54.05 Mpbs.

b. 2.745... standard deviations.

c. The z-score is 2.745....

d. The carrier's highest data speed is significantly high.

Step-by-step explanation:

a. The difference between the highest measured data speed and the mean is 72.6 - 18.55 =  54.05 Mbps.

b. The amount of standard deviations of 54.05 Mbps is equal to this value divided by the standard deviations, so we yield \frac{54.05}{19.69} = 2.745... standard deviations.

c. The z-score is equal to the difference between the mean and a data point in standard deviations, so the z-score is 2.745....

d. 2.745... is not between -2 and 2, so the carrier's highest data speed is not insignificant - so it's significantly high.

You might be interested in
What is:<br><br> 3✖️(-4)➗(-2) -9<br> ———————<br> (+6)
Elis [28]
The answer is - 23/6 it should be
4 0
3 years ago
Line segment pq shown on the graph below, is rotated 90 counterclockwise about point q to form pq
USPshnik [31]

Answer:

this isn’t a 100% guaranteed correct answer but maybe the second option saying “PQ and P’G’ are parallel”

(i’m doing the test rn)

4 0
3 years ago
Read 2 more answers
The number of people who attended a school's last six basketball games increased as the team neared the state sectional games. T
Thepotemich [5.8K]

The function will be a (linear function) linear equation in two variable and the equation of the function is y = 87x  - 783

<h3>What is a linear equation?</h3>

It is defined as the relation between two variables, if we plot the graph of the linear equation we will get a straight line.

If in the linear equation, one variable is present, then the equation is known as the linear equation in one variable.

We have given data:

Game(x):              13      14     15      16       17     18

Attendance(y):    348   435  552  609   696  783

If plot these points on a coordinate plane, we will see these points will align in a straight line.

We know we can find a line equation with two points:

(13, 348) and (14, 435)

\rm (y - 435) = \dfrac{435-348}{14-13}(x-14)

y - 435 =87(x-14)

y = 87x  - 783

Thus, the function will be a (linear function) linear equation in two variable and the equation of the function is y = 87x  - 783

Learn more about the linear equation here:

brainly.com/question/11897796

#SPJ1

7 0
2 years ago
8 men will take 10 days to build a wall 150 metres long. After the men had started working for 6 days, they were told that the w
Mashutka [201]
First, find out how much each man works. If eight men take 10 days to build 150 m of wall, then that means that it takes 80 man days to build 150 m. One Man day is then 150÷80, in other words 1.875. If eight men have already been working for six days, then they have spent 8×6 man days, 48. 48 men days times 1.875 m of wall per man day equals 90 m of wall have been built. So, you have four days left to build the remaining 60 m of wall as well as 45 extra meters, in other words, 105 m total. 105 m divided by four days equals 26.25 m need to be built every day. Since one man builds 1.875 m of wall every day, to find the number of men total you need for the last four days, take 26.25÷1.875, Which equals 14 exactly. 14 is not the answer however, because it’s asking how many more men you need. Since you already have eight, you need six more to make 14

The answer is six more men
3 0
3 years ago
if there are 80 million millennials in the US and 84% give to charity. How many do not give to charity
MA_775_DIABLO [31]
I think you have to divide 80milion and 84
8 0
3 years ago
Other questions:
  • The swim team has 41 people on their team they need new swim gear the swim caps cost $5 and the swim suit cost $ 16 dollars how
    12·1 answer
  • 1.4 - 0.6 or 2 - 1.5 which has greater mas
    11·2 answers
  • Once again plesse help me
    8·2 answers
  • If the function f is defined by f(x)=3x+4, then 2f (x) +4=
    9·1 answer
  • The number of credits being taken by a sample of 13​ full-time college students are listed below. Find the​ mean, median, and mo
    10·1 answer
  • How do you do fraction
    14·1 answer
  • If it takes 30 seconds to break 12 things how many things can you break in 1 minuet
    13·2 answers
  • Write in point slope form of the line that passes through the points (3,-1) and (6,-2)
    9·1 answer
  • If the sine ratio of angle A is 0.544639 then angle A is equal to<br> degrees.
    7·1 answer
  • Write an expression that is equivalent to n + 2 (n+3)
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!