Answer:
Step-by-step explanation:
let score in fourth test=x
88+98+79+x=80×4
265+x=320
x=320-265=55
Answer:
-5, -7, -4, -6, -10
Step-by-step explanation:
Hope this helps!
August 22nd should be the date 120 days after April 24th
Answer:
look at the photo
Step-by-step explanation:
Since the inequality is already written in y=mx+b, you can easily graph the line. +3 is the y intercept, so one point would be (0,3). -2 resembles the slope, so diagonally to the left, you would go up 2 and across 1. Also, since the sign is "<" you would graph with a dotted line. Then to know which side to shade, I always use the coordinate (0,0). I plug in 0 for both x and y to see if (0,0) satisfies the inequality. In this case it does, so you would shade on the side where (0,0) is located.
Scatter plots are used to relate variables using scattered dots.
The best prediction for the number of baskets made in 16 minutes is (c) 14 baskets
From the graph, we can see that the number of baskets made in 14 minutes is 12.
Also, from the graph; as the minutes increases, the number of baskets either remain the same or increases.
This means that, for 16 minutes, the number of baskets would either be 12 (same as 14 minutes) or greater.
The closest to 12 baskets in the option is 14.
Hence, the best prediction for the number of baskets made in 16 minutes is (c) 14 baskets
Read more about scatter plots at:
brainly.com/question/6592115