Information to develop a project network is collected from the work breakdown structure
<h3>
Work breakdown structure </h3>
Work breakdown structure (WBS) is a structure showing the steps needed to be taken so as to complete a project.
WBS is presented in visual format and it is usually arranged based on hierarchy.
Information to develop a project network is collected from the work breakdown structure
Find out more on Work breakdown structure at: brainly.com/question/6197566
Answer:
c. Math.pow(-2.0,15.0) to (Math.pow(2.0,15.0) -1).
Explanation:
short represents a 16-bit signed integer. short is used to save memory because it occupies less space than integers where integers occupy 4 bytes short occupies 2 bytes.
Since it is signed so first bit is used to represent the sign if 0 then positive and 1 then the integer is negative.We are left with 15 bits.
So the range is -2¹⁵ to 2¹⁵-1.
Hence the answer is option c.
Answer:
b
Explanation:
C and D have equivalent iterations
C: D:
99 990
90 900
81 810
72 720
63 630
54 540
45 450
36 360
27 270
18 180
9 90