Answer:
The WIP limit is 0.50 days.
Step-by-step explanation:
The Computation of WIP limits:
to begin with, it is required to compute the process and procedure efficiency which will be computed as follows:
Value Added Time = 12 days (arriving time)
Non-Value-Added Time = 12 days (departure time)
Efficiency = Value Added / (Value Added + Non-Value Added)
= 12 / (12+12)
= 12 / 24
= 0.50 or 50%
the most obligatory throughput time will be 0.25 days to realize the profits
WIP limit = Throughput time / Efficiency
= 0.25 / 50%
= 0.50 days.
The WIP limit is 0.50 days.