Answer:
25 seconds
Step-by-step explanation:
Hi there!
In order to answer this question, first we need to know how many bolts per second are produced by each machine, this can be known by dividing the number of bolts by the time it takes.
For machine A:

For machine B:

So, if the two machines run simultaneously, we will have a rate of prodcution of bolts equal to the sum of both:

Now, we need to know how much time it will take to producee 200 bolts, to find this out we need to divide the amount of bolts by the production rate:

The <em>bolts</em> unit cancell each other and we are left with <em>seconds</em>

So it will take 25 seconds to produce 200 bolts with machine A and B running simultaneously.
Greetings!
Answer:
50.24
Step-by-step explanation:
8/2 = 4
3.14 x 4^2 = 50.24
A priori means as things were in the beginning or at the start.
a posteriori means as things are after any event.
Answer:
10 square inches
Step-by-step explanation:
cost of a plain t-shirt = $10
cost of 1 square inch of design addition = $1.50
let there be x square inches of design
then cost of x square inches of design = x*cost of 1 square inch of design
= 1.50*x = 1.5x
Total cost for t-shirt with x square inches of design = cost of a plain t-shirt + cost of x square inches of design = 10 + 1.5 x
It is given that Makeeya has only $25, then total cost which can be afforded by him will be $25 only
Thus,
10 + 1.5 x = 25
=> 1.5x = 25-10 = 15
=> x = 15/1.5 = 10
Thus, Makeeya can put 10 square inches of design on her T-shirt.