Answer:
20 days
Step-by-step explanation:
It takes 12 men 5 days to complete a job. Work out how many days it would take 3 men to complete the same job.
12 * 5 = 60
60/3 = 20
It will take 3 men 20 days to do the same job
Answer:
Daughter age = 3 years
Step-by-step explanation:
Let x be the age of the women and y be the age of the daughter.
Given:
After five year the sum of the women and daughter age = 40

At present the sum of the women and daughter age



--------------(1)
So the sum of the present age is 
The difference in their present age is 24 years.


Now we substitute x value in equation 1.






Therefore, the daughter age is 3 years.
Answer:
The correct option is the graph on the bottom right whose screen grab is attached (please find)
Step-by-step explanation:
The information given are;
The required model height for the designed clothes should be less than or equal to 5 feet 10 inches
The equation for the variance in height is of the straight line form;
y = m·x + c
Where x is the height in inches
Given that the maximum height allowable is 70 inches, when x = 0 we have;
y = m·0 + c = 70
Therefore, c = 70
Also when the variance = 0 the maximum height should be 70 which gives the x and y-intercepts as 70 and 70 respectively such that m = 1
The equation becomes;
y ≤ x + 70
Also when x > 70, we have y ≤
-x + 70
with a slope of -1
To graph an inequality, we shade the area of interest which in this case of ≤ is on the lower side of the solid line and the graph that can be used to determine the possible variance levels that would result in an acceptable height is the bottom right inequality graph.
To convert a fraction to a decimal, divide the numerator by the denominator (divide the top by the bottom)
Maria because she is in debt of $210 meaning she owes $210. That is greater than the other debts.