Answer:
7.2 Kilometers
Step-by-step explanation:
800 meters = 0.8 kilometers
<u>Therefore, do 0.8 x 9</u>
0.8 x 9 = 7.2 kilometers
Check the picture below.
so, bearing in mind that vertical angles are equal, thus ∡AED = ∡BEC, and we know that ∡BEC = 52 = ∡AED, so those two angles added up are 104°.
now, a circle has a total of 360°, if we take away those 104° from the red angles, what's leftover is just 256°, well, the green angles there are also vertical angles and thus twins, so each one will take half of 256°.
∡BEA = 128° = ∡CED.
The slope of the line is 2/3, so the angle is arctan(2/3) ≈ 33.69°.
Answer:
2.4 hours
Step-by-step explanation:
Let total work = X
Rate of work done = X ÷ time
Rate of A = X/4
Rate of B = X/6
If they work together, rate is the sum of their individual rates, i.e.
X/4 + X/6
= (3X + 2X)/12 (taking LCM)
=5X/12
Rate = X/time
5X/12 = X/time
time = X÷(5X/12)
time = X × 12/(5X)
time = 2.4 hours
Shortcut:
Product of individual times/sum of individual times
= (4×6)/(4+6)
=24/10
=2.4 hours