over-processing type of organizational waste refers to the work that is unnecessary or undesired and is a waste of time and resources
Explanation:
- Over -Processing is one of the seven waste of a lean manufacturing system.
- It is caused due to uncleared standards and specification of a process.
- For example:Extra Plastic Packaging on a fresh fruit of vegetable
<span>The answer is letter c.
It is a cabinet department and is primary responsible for defending U.S.
territories and protectorates. It is
also responsible for countering terrorist attacks as well as natural and
man-made disasters. It was created after
the September 11 attacks on the World Trade Center and the Pentagon.</span>
Answer:
Take up a hobby, do not think of them.
"The mass of Substance C is five times the mass of Substance B", the given statement is correct.
Answer: Option D
<u>Explanation:</u>
As Jessie added 16 gm. of Substance A to 4 gm. of Substance B Obtained certain amount of Substance C which can be calculated as follows:
amount of Substance C = Substance A + Substance B = 16 + 4 = 20 gm
Therefore, 20 gram of Substance C was obtained. Here, fourth statement is correct which says the mass of Substance C ifs five times the mass of Substance B to justify this, see the below:

Answer:
Reactive
Explanation:
A proactive approach is one that tries to anticipate problems or conflict. In other words, it tries to preempt events and even prevent them from happening. On the other hand, a reactive approach is one that "reacts" to a problem. This approach requires a problem or event to take place before any action is taken.