1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
dimulka [17.4K]
3 years ago
12

Pls hurry don’t write paragraph

Mathematics
1 answer:
adelina 88 [10]3 years ago
4 0

Answer:

Where is the question? I don't see it

You might be interested in
A cube with a side length s can be split into three congruent pyramids which formula represents the volume of a square pyramid
Assoli18 [71]
The volume of a triangular pyramid<span> can be found using the </span>formula<span> V = 1/3AH where A = area of the triangle base, and H = height of the </span>pyramid<span> or the distance from the </span>pyramid's<span> base to the apex.</span>
7 0
3 years ago
Simplify
Schach [20]
2x + 7y + 3x + 4y 

(2x+3x)+(7y-4y)&#10; &#10;   Gather \ like \ terms 

5x+11y
8 0
3 years ago
sarah can complete a project in 90 minutes and her sister betty can complete it in 120 minutes if they both work on the project
alukav5142 [94]

Answer:

It will take them approximately 51.43 minutes to complete the project together

Step-by-step explanation:

This is what is called a "shared job" problem.

The best way to work on them is to start by finding the "portion" of the job done by each of the people in the unit of time.

So, for example, Sarah completes the project in 90 minutes, so in the unit of time (that is 1 minute) she completed 1/90 of the total project

Betty completes the project in 120 minutes, so in the unit of time (1 minute) she completes 1/120 of the total project.

We don't know how long it would take for them to complete the project when working together, so we call that time "x" (our unknown).

Now, when they work together completing the entire job in x minutes, in the unit of time they would have done 1/x of the total project.

In the unite of time, the fraction of the job done together (1/x) should equal the fraction of the job done by Sarah (1/90) plus the fraction of the job done by Betty. This in mathematical form becomes:

\frac{1}{x} =\frac{1}{90} +\frac{1}{120}\\\frac{1}{x} =\frac{4}{360} +\frac{3}{360}\\\frac{1}{x} =\frac{7}{360} \\x=\frac{360}{7} \\x=51.43\,\,min

So it will take them approximately 51.43 minutes to complete the project together.

8 0
3 years ago
I need help indicating the exterior angle
levacccp [35]

Check the picture below.

7 0
3 years ago
Please help 15 points!!!
Julli [10]

Answer:

she earns $10 per hour, and can earn $1 in 6 minutes (60 min divided by $10)

Step-by-step explanation:

3 0
2 years ago
Other questions:
  • The average number of pounds of red meat a person consumes each year is 196 with a standard deviation of 22 pounds (source: amer
    14·1 answer
  • HELPPPPP PLZZZzzzzzz
    7·2 answers
  • If the diagonals of a rhombus are represented by 4x and 6x, the area may be represented by (please give answer with solution)
    6·1 answer
  • The expression <br><img src="https://tex.z-dn.net/?f=x%20%7B%3F%7D%5E%7B2%7D%20%20-%2016" id="TexFormula1" title="x {?}^{2} - 1
    9·1 answer
  • Find the average value of f over region
    5·1 answer
  • Find the slope ( math )
    9·1 answer
  • What is the circumference of the circle of a diameter of 12​
    15·2 answers
  • Its the final brain cell.<br> (intense music)<br> help this is easy WiLL mArK bRaiNLieSt
    5·1 answer
  • if the slopes of the lines in the system are equal and their y-intercepts are also equal, then the system is blank and blank
    6·1 answer
  • For each of the number lines, write an absolute value equation that has the following solution set. 26 and m
    15·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!