1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Ilya [14]
3 years ago
10

Answer this question please ASAP!

Mathematics
1 answer:
Ilya [14]3 years ago
5 0

Answer:

2

Step-by-step explanation:

You might be interested in
Which are correct representation of the inequality minus 32X -5 less than 52 minus X select two options
Murljashka [212]

Answer:

The value of X is more than equal to -1.83.

Step-by-step explanation:

We need to find the correct representation of the inequality 'minus 32X -5 less than 52 minus X'

LHS of the inequality will be : -32x-5

RHS of the inequality will be : (52-X)

So,

-32X-5\leq 52-X

Adding X both sides

-32X-5+X\leq 52-X+X\\\\-31X-5\leq 52

Adding 5 to both sides,

-31X-5+5\leq 52+5\\\\-31X\leq 57

Dividing both sides by -31.

X\geq \dfrac{-57}{31}\\\\X\geq  -1.83

So, the value of X is more than equal to -1.83.

5 0
3 years ago
How can you be sure that 0.1 ÷ 100 = 0.001?
KATRIN_1 [288]

Answer: When dividing by 100, move the decimal two places to the left

Step-by-step explanation: 0.1 / 100 = 0.001

There are 2 zeros in 100 so you move the decimal to the left 2 times when you are dividing. When you move the decimal 2 times in 0.1 you get 0.001

8 0
3 years ago
Read 2 more answers
A manufacturing company produces 3 different products A, B, and C. Three types of components, i.e., X, Y, and Z, are used in the
Murljashka [212]

Answer:

Step-by-step explanation:

Using the Excel Formula:

Decision    Variable        Constraint              Constraint

A                     65                          65                         100

B                     80                          80                         80

C                     90                         90                          90

                      14100                    300                        300

= (150 *B3)+(80*B4) +(65*B5)-(100-B3+80-B4+90-B5)*90

Now, we have:

Suppose A, B, C represent the number of units for production A, B, C which is being manufactured

                             A              B                  C                Unit price

Need of X          2                 1                   1                     $20

Need of Y           2                3                  2                    $30

Need of Z           2                2                  3                    $25

Price of  

manufac -      $200          $240            $220      

turing

Now,  for manufacturing one unit of A, we require 2 units of X, 2 units of Y, 2 units of Z are required.  

Thus, the cost or unit of manufacturing of A is:

$20 (2) + $30(2) + $25(2)

$(40 + 60 + 50)

= $150

Also, the market price of A = $200

So, profit = $200 - $150 = $50/ unit of A

Again;

For manufacturing one unit of B, we require 1 unit of X, 3 units of Y, and 2 units of Z are needed and they are purchased at $20, $30, and 425 each.

So, total cost of manufacturing a unit of B is:

= $20(1) + $30(3) + $25(2)

= $(20 + 90+50)

= $160

And the market price of B = $240

Thus, profit = $240- $160  

profit = $80

For manufacturing one unit of C, we have to use 1 unit of X, 2 unit of Y, 3 units of Z are required:

SO, the total cost of manufacturing a unit of C is:

= $20 (1) + $30(2) + $25(3)

= $20 + $60 + $25

= $155

This, the profit = $220 - $155 = $65

However; In manufacturing A units of product A, B unit of product B & C units of product C.

Profit  --> 50A + 80B + 65C

This should be provided there is no penalty for under supply of there is under supply penalty for A, B, C is $40

The current demand is:

100 - A

80 - B

90 - C respectively

So, the total penalty

{(100 - A) + (80 - B) +(90 - C) } + \$40

This should be subtracted from profit.

So, we have to maximize the profit  

Z = 50A + 80B + 65C = {(100 -A) + (80 - B) + (90 - C)};

Subject to constraints;

we have the total units of X purchased can only be less than or equal to 300 due to supplies capacity

Then;

2A + B +C \le 300 due to 2A, B, C units of X are used in manufacturing A, B, C units of products A, B, C respectively.

Next; demand for A, B, C will not exceed 100, 80, 90 units.

Hence;

A \le 100

B \le 80

C \le 90

 

and A, B, C \ge 0 because they are positive quantities

The objective is:

\mathbf{Z = 50A + 80B + 65 C - (100 - A + 80 - B + 90 - C) * 40}

A, B, C \to Decision Varaibles;

Constraint are:

A \le 100 \\ \\  B \le 100 \\ \\ C \le 90 \\ \\2A + B + C \le 300 \\ \\ A,B,C \ge 0

6 0
3 years ago
Someone please solve & explain
den301095 [7]

Answer:

y+20 = 9(x+2)

Step-by-step explanation:

The slope that passes through the points is

m = (y2-y1)/(x2-x1)

    = (79- -20)/ (9--2)

    = (79+20)/(9+2)

     = 99/11

     = 9

We can use point slope form to write an equation.  It says to use the first point.

y-y1 = m(x-x1)

y--20 = 9(x--2)

y+20 = 9(x+2)


7 0
3 years ago
Which is not a correct way to rewrite this expression using the distributive
Effectus [21]

Given:

The expression is

(2x^2+4x-7)(x-2)

To find:

The expression which is not a correct way to rewrite the given expression.

Solution:

We have,

(2x^2+4x-7)(x-2)

Using distributive property, we get

=(2x^2)(x-2)+(4x)(x-2)+(-7)(x-2)

=(2x^2)(x)+(2x^2)(-2)+(4x)(x)+(4x)(-2)+(-7)(x)+(-7)(-2)

Using distributive property the given expression can rewritten as:

=(2x^2+4x-7)(x)+(2x^2+4x-7)(-2)

Only the expression in option A is not a correct way to rewrite the given expression because (2x^2+4x-7) is not distributed to (x-2) properly.

Therefore, the correct option is A.

3 0
3 years ago
Other questions:
  • ∫ 5cos(x) - 2sec²(x) dx
    13·1 answer
  • A high school football pennant is in the shape of an isosceles triangle. The base is 18 inches long. The sides meet at an angle
    11·1 answer
  • Equation of the line that passes through (8,-7) (-6,-7)
    15·2 answers
  • Find the 15th term in the geometric sequence shown below. <br><br>1, 3, 9...
    14·2 answers
  • A boat is 60% full with 48. What is the maximum carrying capacity?
    11·2 answers
  • Please help!.... 7th grade math..
    6·2 answers
  • file:///var/mobile/Library/SMS/Attachments/c9/09/EDD6F50C-2A7A-4356-A142-874DDEA82BE9/63296923268__4EF12089-C66E-406A-B933-ADD5A
    10·1 answer
  • HELP ME PLEASE! I need to find the Interquartile range of : 0,0,0,1,1,3,3,3,4,4,4,6,6,7,7,7,8,8,9,10
    14·1 answer
  • Rationalize the denominator 1/3√3
    13·1 answer
  • Darryl ran 17.3 miles more than Imani last week. Darryl ran 26.3 miles. How many miles did Imani run?
    7·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!