Answer:
25/9
Step-by-step explanation:
25/9
Answer:
4
Step-by-step explanation:
rise/run = slope
As it goes to the left or adds by one, it goes up by 4
4/1
First, look at the x axis (this is the one labeled Minutes Used per month)
Find the number 40, then look at where the lines meet on that line. The red line for Plan B it’s at 8 dollars. The blue line for Plan A is at 4 dollars.
Plan B costs more.
To find the difference, subtract 4 from 8.
$8 - $4 = $4
Plan B costs 4 dollars more than Plan A.
If you have any further questions feel free to ask.
Hope this helps.
Data:
r (radius) = 3.5 in
h (height) = 8 in
Adopt:
V (volume) = ?
Ink cost per cubic inch = $0.05/in³
Total cost: ?
<span>Calculate the volume of the paint bucket (its formed being cylindrical), we have:
</span>
<span>What was the total cost of the paint?
</span>price($)___measure(in³)
0.05 ---------- 1
y -------------- 307.72
It is made the rule of three: (<span>directly proportional)
</span>
multiply cross
Answer:
<span>
the total cost of the paint is $15</span>
Answer:
they are equal
Step-by-step explanation:
because you can add how many zeroes after 2.79 but it is going to still be equal.