Yeah same what you need help on tho
Answer:
37
20
C
a
→
37
19
K
+
0
+
1
e
This equation shows us the parent atom, which is calcium-37. The mass number is written above the atomic number for the atom. The arrow indicates the decay process with the products to the right of the arrow. The products are an atom of potassium-37 and a positron, which is similar to an electron but it carries a charge of +1 instead of a charge of -1. We can see that the transition of a proton to a neutron in positron decay decreases the atomic number of the atom from 20 to 19, but the mass number of 37 remains the same.
Step-by-step explanation:
Answer:
The inequality representing the time taken by the entire cycle is:
Step-by-step explanation:
The time taken to complete one cycle of a manufacturing machine is no longer than 3 minutes.
It is provided that the manufacturing machine has two processes.
One of them is repeated 4 times and the second only once.
Assume that the variable <em>x</em> represents the time taken to complete the first process once.
Then the time taken to complete the first process 4 times would be, 4<em>x</em>.
Also assume that the variable <em>y</em> represents the time taken to complete the second process.
Then the inequality representing the time taken by the entire cycle is:
Consider the graph below representing the above equation.
3:80
4:20 those are the answers
I’m pretty sure the answer is A