1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
AlladinOne [14]
3 years ago
11

I need help please!!!!

Mathematics
1 answer:
Luba_88 [7]3 years ago
3 0
The first two is wrong, the last two is one of the right ones, I think it’s c
You might be interested in
Evaluate the following expression when x = 3 and y = 4:
OLEGan [10]

\dfrac{ {3}^{2} +  {4}^{3}  }{2 + 3}  \\  =  \dfrac{9 + 64}{5}  \\  =  \dfrac{73}{5}  \\  = 14.6

Answer is C.

Hope this helps. - M
3 0
3 years ago
Read 2 more answers
Can some one answer this?
Anvisha [2.4K]

Answer:

1. They ate 1/6 of the donuts

2. 2/3

Step-by-step explanation:

1. They bought 18 donuts. 1/2 of 18 is 9. 1/3 of 9 is 3. To find the fraction, divide 3 by 18. Simplify the fraction. You are left with 1/6.

2. 1 1/3=4/3×1/2=4/6=2/3

5 0
2 years ago
A croissant shop produces two products: bear claws (B) and almond filled croissants (C). Each bear claw requires 6 oz of flour,
Kruka [31]

Answer:

letter A: B = 400; C = 1000; Max Z = $380

Step-by-step explanation:

bear claws (B) need 6 oz of flour (f), 1 oz of yeast (y), 2 ts of paste (p)

croissants (C) need 3 oz of flour (f), 1 oz of yeast (y), 4 ts of paste (p)

putting that information in equations, we have:

B = 6f + y + 2p

C = 3f + y + 4p

The total number of resources (R) are:

R = 6600f + 1400y + 4800p

Let's call M our total profit, "k1" the number of B produced and "k2" the number of C produced.

So, we can state that:

M = k1*0.2 + k2*0.3

The number of resources R2 will demand is calculated like this:

R2 = k1*B + k2*C = (6k1+3k2)f + (k1+k2)y + (2k1+4k2)p

using R2 and R, we can make some inequations:

6k1+3k2 <= 6600 -> 2k1+k2 <= 2200

k1+k2 <= 1400

2k1+4k2 <= 4800 -> k1+2k2 <= 2400

if we try to maximize k2 (as it worths more), we will have k1 = 0 and k2 = 1200 (limited by p), but looking at the resources R, we will still have resources to use (f and y). Looking at B and C expressions, we see that removing one C gives enough 'p' to make 2 B, which is a good trade (as 2B worths 0.4 cents, and 1C worths 0.3 cents). we have 200 'y' remaining, so doing this 200 times give us k1 = 400 and k2 = 1000, and the only resource remaining will be some of 'f'.

calculating the profit M, we have:

M = 400*0.2 + 1000*0.3 = 380$

the right answer is letter A.

3 0
3 years ago
A scalene triangle is _______ isosceles.<br><br> - Sometimes<br> - Always<br> - Never
cricket20 [7]

Answer:

never

Step-by-step explanation:

Scalene triangles have no sides equal.

5 0
3 years ago
Answer this for brainilest and 30points (no links or internet answer or you will get flagged
MariettaO [177]

Answer:

0.6 is your answer if you need explanation than comment me

3 0
2 years ago
Other questions:
  • We use __________ for the test statistic when the population standard deviation σ is unknown.
    12·1 answer
  • QUICK PLEASE HELP. I'm offering 15pt and brainliest answer.
    7·2 answers
  • What is 0.0417 in scientific notation?
    13·2 answers
  • If the ratio of side lengths of similar polygons is 6:11, what is the ratio of perimeters
    6·1 answer
  • X=0,100,200,300, y=3.5,38.5 73.5, 108.5
    12·2 answers
  • Juan builds a square dog pen that has an area of 100 square feet. He then builds a second pen that has an area of 49 square feet
    8·2 answers
  • (6n – 7) + (8n + 2) = 23
    7·2 answers
  • If the price showing on the pump is 3.799,what is the price per gallon to the nearest cent?
    11·1 answer
  • How many times does 6 go into 719 divison with partial quotient
    8·2 answers
  • Rikki decided to collect data to determine if a runner's time and speed are correlated. She determined the data to have a correl
    12·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!