You need to divide the amount from the quantity
So 5.92 divide by 166= $0.37 per pound.
Answer:
x = 3
Step-by-step explanation:
x + 9x + 5 = 35
=> x + 9x = 35 - 5
=> x + 9x = 30
=> 10x = 30
=> x = 30/10
=> x = 3
Y=5x the m would be 5 it is the slope
Answer:
the probability that more than 70% of customers in the sample will need additional maintenance is 0.0371
Step-by-step explanation:
From the information given:
we are to determine the probability that more than 70% of customers in the sample will need additional maintenance
In order to achieve that, let X be the random variable that follows a binomial distribution.
Then X
Bin(48, 0.6)
However 70% of 48 samples is
= 0.7 × 48 = 33.6
34
Therefore, the required probability is:
= P(X> 34)



= 0.03709524328
0.0371
Answer:
<h2>
0.0526ft/min</h2>
Step-by-step explanation:
Since the gravel being dumped is in the shape of a cone, we will use the formula for calculating the volume of a cone.
Volume of a cone V = πr²h/3
<em>If the diameter and the height are equal, then r = h</em>
V = πh²h/3
V = πh³/3
If the gravel is being dumped from a conveyor belt at a rate of 20 ft³/min, then dV/dt = 20ft³/min
Using chain rule to get the expression for dV/dt;
dV/dt = dV/dh * dh/dt
From the formula above, dV/dh = 3πh²/3
dV/dh = πh²
dV/dt = πh²dh/dt
20 = πh²dh/dt
To calculate how fast the height of the pile is increasing when the pile is 11 ft high, we will substitute h = 11 into the resulting expression and solve for dh/dt.
20 = π(11)²dh/dt
20 = 121πdh/dt
dh/dt = 20/121π
dh/dt = 20/380.133
dh/dt = 0.0526ft/min
This means that the height of the pile is increasing at 0.0526ft/min