Answer:
Fourth option: 30 days
Step-by-step explanation:
We three path to complete the project:
Path A:
A1 → A2 → A3
10 days → 8 days → 9 days = 27 days
Path B:
B1 → B2 → B3
2 days → 7 days → 3 days = 12 days
Path C:
C1 → C2 → C3
10 days → 8 days → 12 days = 30 days
Then the duration of the critical path is 30 days, we can't conclude the project until each path has finished
Ànswer is A
Where h=-6 and k=-5whereh k vertex of a parabola
Weight of slab of beeswax isn't given.
Assume slab of beeswax = 36 gram.
Answer:
3 gram
Step-by-step explanation:
Each slab of beeswax = 36 gram
Total weight of all 3 slabs = (3 * 36) = 108 g
Number of same-sized candles to make = 36
The weight of each candle will be ;
Total weight of slabs / number of candles
108 g / 36
= 3 grams
Answer: i think its 77%
Step-by-step explanation:
Answer:
Front, 60, back 60, right, 30, left, 30. And the triangle's surface area is 15 + 15 = 30, And 20 / 2 = 10. SO the surface area is 190 cm^2
Step-by-step explanation: