1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
marusya05 [52]
3 years ago
8

Find the measurement of the base. 3.5 in Area = 12.6 in?

Mathematics
1 answer:
Arada [10]3 years ago
6 0
3.6 in i believe
12.6 divided by 3.5
= 12.6/3.5
= 3.6
3.6 x 3.5
= 12.6 =12.6
You might be interested in
Please help me answer question B!
skelet666 [1.2K]

Answer:

  • The program counter holds the memory address of the next instruction to be fetched from memory
  • The memory address register holds the address of memory from which data or instructions are to be fetched
  • The memory data register holds a copy of the memory contents transferred to or from the memory at the address in the memory address register
  • The accumulator holds the result of any logic or arithmetic operation

Step-by-step explanation:

The specific contents of any of these registers at any point in time <em>depends on the architecture of the computer</em>. If we make the assumption that the only interface registers connected to memory are the memory address register (MAR) and the memory data register (MDR), then <em>all memory transfers of any kind</em> will use both of these registers.

For execution of the instructions at addresses 01 through 03, the sequence of operations may go like this.

1. (Somehow) The program counter (PC) is set to 01.

2. The contents of the PC are copied to the MAR.

3. A Memory Read operation is performed, and the contents of memory at address 01 are copied to the MDR. (Contents are the LDA #11 instruction.)

4. The MDR contents are decoded (possibly after being transferred to an instruction register), and the value 11 is placed in the Accumulator.

5. The PC is incremented to 02.

6. The contents of the PC are copied to the MAR.

7. A Memory Read operation is performed, and the contents of memory at address 02 are copied to the MDR. (Contents are the SUB 05 instruction.)

8. The MDR contents are decoded and the value 05 is placed in the MAR.

9. A Memory Read operation is performed and the contents of memory at address 05 are copied to the MDR. (Contents are the value 3.)

10. The Accumulator contents are replaced by the difference of the previous contents (11) and the value in the MDR (3). The accumulator now holds the value 11 -3 = 8.

11. The PC is incremented to 03.

12. The contents of the PC are copied to the MAR.

13. A Memory Read operation is performed, and the contents of memory at address 03 are copied to the MDR. (Contents are the STO 06 instruction.)

14. The MDR contents are decoded and the value 06 is placed in the MAR.

15. The Accumulator value is placed in the MDR, and a Memory Write operation is performed. Memory address 06 now holds the value 8.

16. The PC is incremented to 04.

17. Instruction fetch and decoding continues. This program will go "off into the weeds", since there is no Halt instruction. Results are unpredictable.

_____

Note that decoding an instruction may result in several different data transfers and/or memory and/or arithmetic operations. All of this is usually completed before the next instruction is fetched.

In modern computers, memory contents may be fetched on the speculation that they will be used. Adjustments need to be made if the program makes a jump or if executing an instruction alters the data that was prefetched.

4 0
3 years ago
Can someone please please help me
Alekssandra [29.7K]

Answer:

The answer is None

Step-by-step explanation:

Multiply 6 2 and 1 and also multiply 12 4 and 2 separately now divide 96 with 12 and you get 8 which is none of the answer choices

6 0
3 years ago
Read 2 more answers
The current temperature of 8"F below zero is 21°F below the high temperature of the day. What is the high temperature for the da
wariber [46]

Answer:

24°c

Step-by-step explanation:

PLEASE accept me in brainly

3 0
3 years ago
The taxi and takeoff time for commercial jets is a random variable x with a mean of 8.3 minutes and a standard deviation of 3.3
In-s [12.5K]

Answer:

a) There is a 74.22% probability that for 37 jets on a given runway, total taxi and takeoff time will be less than 320 minutes.

b) There is a 1-0.0548 = 0.9452 = 94.52% probability that for 37 jets on a given runway, total taxi and takeoff time will be more than 275 minutes.

c) There is a 68.74% probability that for 37 jets on a given runway, total taxi and takeoff time will be between 275 and 320 minutes.

Step-by-step explanation:

The Central Limit Theorem estabilishes that, for a random variable X, with mean \mu and standard deviation \sigma, a large sample size can be approximated to a normal distribution with mean \mu and standard deviation \frac{\sigma}{\sqrt{n}}.

Problems of normally distributed samples can be solved using the z-score formula.

In a set with mean \mu and standard deviation \sigma, the zscore of a measure X is given by:

Z = \frac{X - \mu}{\sigma}

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.

In this problem, we have that:

The taxi and takeoff time for commercial jets is a random variable x with a mean of 8.3 minutes and a standard deviation of 3.3 minutes. This means that \mu = 8.3, \sigma = 3.3.

(a) What is the probability that for 37 jets on a given runway, total taxi and takeoff time will be less than 320 minutes?

We are working with a sample mean of 37 jets. So we have that:

s = \frac{3.3}{\sqrt{37}} = 0.5425

Total time of 320 minutes for 37 jets, so

X = \frac{320}{37} = 8.65

This probability is the pvalue of Z when X = 8.65. So

Z = \frac{X - \mu}{\sigma}

Z = \frac{8.65 - 8.3}{0.5425}

Z = 0.65

Z = 0.65 has a pvalue of 0.7422. This means that there is a 74.22% probability that for 37 jets on a given runway, total taxi and takeoff time will be less than 320 minutes.

(b) What is the probability that for 37 jets on a given runway, total taxi and takeoff time will be more than 275 minutes?

Total time of 275 minutes for 37 jets, so

X = \frac{275}{37} = 7.43

This probability is subtracted by the pvalue of Z when X = 7.43

Z = \frac{X - \mu}{\sigma}

Z = \frac{7.43 - 8.3}{0.5425}

Z = -1.60

Z = -1.60 has a pvalue of 0.0548.

There is a 1-0.0548 = 0.9452 = 94.52% probability that for 37 jets on a given runway, total taxi and takeoff time will be more than 275 minutes.

(c) What is the probability that for 37 jets on a given runway, total taxi and takeoff time will be between 275 and 320 minutes?

Total time of 320 minutes for 37 jets, so

X = \frac{320}{37} = 8.65

Total time of 275 minutes for 37 jets, so

X = \frac{275}{37} = 7.43

This probability is the pvalue of Z when X = 8.65 subtracted by the pvalue of Z when X = 7.43.

So:

From a), we have that for X = 8.65, we have Z = 0.65, that has a pvalue of 0.7422.

From b), we have that for X = 7.43, we have Z = -1.60, that has a pvalue of 0.0548.

So there is a 0.7422 - 0.0548 = 0.6874 = 68.74% probability that for 37 jets on a given runway, total taxi and takeoff time will be between 275 and 320 minutes.

7 0
3 years ago
I need all the spaces filled in please :)
Artist 52 [7]

Answer:

3x + y = -16      

Step-by-step explanation:

<u><em>Explanation:-</em></u>

Given a system of equations are

        5x+6y =-5  

       - 2x  - 5y = -11

multiply '1' and Adding two system of equtions

                 + 1      (5x   +  6y   =  -5)

                + 1      (<u> -2x    -   5y  =   -11)</u>

                   <u>       3x    +    y   = -16           </u>

<u>Final answer:-</u>

                          5x   +  6y   =  -5

                        <u> -2x    -   5y  =   -11</u>

                   <u>       3x    +    y   = -16           </u>

<u />

7 0
3 years ago
Other questions:
  • After simplifying, how many terms does the expression 4y-6+y2-9 contain?​
    10·2 answers
  • Which scenario is modeled by the equation (x)(0.6) = $86.46?
    8·2 answers
  • To prove that the triangle are similar by the sss similarity theorem it needs to be shown that
    10·1 answer
  • PLEASE HELP The graph of function g is a vertical stretch of the graph of function f ​​by a factor of 10.
    14·1 answer
  • Please do this ASAP! Due tomorrow. 9:12pm here.
    7·1 answer
  • Factor tree for number 119
    5·1 answer
  • Please help I’ll give Brainliest to the best answer
    14·1 answer
  • Avery and Nolan's baseball teams are fundraising. Avery's team has reached ⅗ of their goal. Nolan's team has reached 5/9 of thei
    6·1 answer
  • Anis completed a journey of 4.5 km by walking for 30 minutes at
    8·1 answer
  • Lincoln is preparing many gifts for a family holiday party. Each gift must either be wrapped with wrapping paper or prepared in
    12·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!