Answer: soluble
Step-by-step explanation:
Thank you for posting your question here at brainly. I hope the answer will help you. Feel free to ask more questions.
2^n - 3 = 83
<span>2^n = 86 </span>
<span>ln(2^n) = ln(86) </span>
<span>n*ln(2) = ln(86) </span>
<span>n= ln(86)/[ln(2)] (which is the same as "log base 2 of 86") </span>
<span>n= 6.426264755</span>
Answer:
The probability that the time between the next two calls is between 3 minutes and 7 minutes is 0.2442.
Step-by-step explanation:
Let <em>X</em> = time between calls made to Amazon's customer service.
The average time between calls is, <em>β</em> = 10 minutes.
The random variable <em>X</em> follows an Exponential distribution with parameter 
The probability distribution function of <em>X</em> is:

Compute the probability that the time between the next two calls is between 3 minutes and 7 minutes as follows:

Thus, the probability that the time between the next two calls is between 3 minutes and 7 minutes is 0.2442.
Answer:
D) 74
Step-by-step explanation:
1c = 6p
1c = 1.5f
1f = 296
6/1.5 = 4
296/4 = 74
This question is incomplete
Complete Question
Consider greenhouse A with floor dimensions w = 16 feet , l = 18 feet.
A concrete slab 4 inches deep will be poured for the floor of greenhouse A. How many cubic feet of concrete are needed for the floor?
Answer:
96 cubic feet
Step-by-step explanation:
The volume of the floor of the green house = Length × Width × Height
We convert the dimensions in feet to inches
1 foot = 12 inches
For width
1 foot = 12 inches
16 feet = x
Cross Multiply
x = 16 × 12 inches
x = 192 inches
For length
1 foot = 12 inches
18 feet = x
Cross Multiply
x = 18 × 12 inches
x = 216 inches
The height or depth = 4 inches deep
Hence,
Volume = 192 inches × 216 inches × 4 inches
= 165888 cubic inches
From cubic inches to cubic feet
1 cubic inches = 0.000578704 cubic foot
165888 cubic inches = x
Cross Multiply
x = 16588 × 0.000578704 cubic foot
x = 96 cubic feet
Therefore, 96 cubic feet of concrete is needed for the floor