Likurg_2 [28]
3 years ago
15

Write an equation in slope-intercept form for the line with slope 3 and y-intercept -8. Then graph the line.

Mathematics
1 answer:
iogann1982 [59]3 years ago
3 0

Answer:

y = 3x + -8

Step-by-step explanation:

You might be interested in
What is two fifths if 35 dollars and 10 cents??
Verdich [7]
14.04 US dollars or 14 4/10
6 0
3 years ago
Find an equation for G.
zaharov [31]

Answer:

i think the answer is 60

Step-by-step explanation:

5 0
2 years ago
Is x =4 a solution of the equation <br> 13=2x + 4?<br><br> A.yes <br> B.no
Harman [31]

No, it is not. If you plug 4 into the equation in the place of x, you get 13=2(4)+4

13=8+4

13=12

It equals 12, not 13.

8 0
2 years ago
Read 2 more answers
One watering system needs about three times as long to complete a job as another warning system when both systems operate at the
algol13

Answer:

One watering system requires 36 minutes to complete the job alone while another watering system requires 12 minutes to complete the job alone.

Step-by-step explanation:

Given:

Both the system can complete the job = 9 minutes

We need find the time required by each system to do the job.

Solution:

Let the time required by another watering system to complete the job be 'x' mins.

Now given:

One watering system needs about three times as long to complete a job as another watering system.

Time required by one watering system = 3x

Rate to complete the job by another watering system = \frac{1}{x}\ job/min

Rate to complete the job by One watering system = \frac{1}{3x}\ job/min

Rate at which both can complete the job = \frac{1}{9}\ job/min

So we can say that;

Rate at which both can complete the job is equal to sum of Rate to complete the job by another watering system and Rate to complete the job by One watering system.

framing in equation form we get;

\frac{1}{x}+\frac{1}{3x}=\frac19

Now taking LCM to make the denominator common we get;

\frac{1\times3}{x\times 3}+\frac{1\times1}{3x\times1}=\frac19\\\\\frac{3}{3x}+\frac{1}{3x}=\frac19\\\\\frac{3+1}{3x}=\frac{1}{9}\\\\\frac{4}{3x}=\frac{1}{9}

By Cross multiplication we get;

4\times9 =3x\\\\3x =36

Dividing both side by 3 we get;

\frac{3x}{3}=\frac{36}{3}\\\\x=12\ min

Time required by One watering system = 3x =3\times 12 =36\ min

Hence One watering system requires 36 minutes to complete the job alone while another watering system requires 12 minutes to complete the job alone.

6 0
3 years ago
Solve the system.
anyanavicka [17]
X= -2
Y= -1
Z= 1
You may use solve this problem by substituting the values as well. If everything goes wrong , go for Cramer’s rule
3 0
3 years ago
Other questions:
  • The approximate distance of the moon from Earth is 4 x 105 km and the average approximate distance from the Earth to Venus is 4
    8·2 answers
  • Set G is the set of positive integers divisible by 4 in set if is the set of perfect squares list the first five elements of set
    7·1 answer
  • Help Please I really think its c for 7
    5·1 answer
  • John's age increased by 11 is 5 less than 5 times his age. How old is he? If x represents John's age, which of the following equ
    15·2 answers
  • 16. Construct 3 equations starting with x = 5.
    8·1 answer
  • Whats the equation for finding the area of a triangular prism?
    15·1 answer
  • Find the area of the semicircle.
    13·1 answer
  • How many four-letter codes can be made if no letter can be used twice?
    11·2 answers
  • Multiply (2-5i)(2+5i)
    13·1 answer
  • 1)A fisheries biologist wants to estimate the average weight of small mouth bass in Gull
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!