Answer:
8x+4y
Step-by-step explanation:
so use the distributive property and multiply 4 into (2x+y), so you get
(2x*4) + (y*4) = 8x + 4y
hope this helped
Answer:
3.33..
Step-by-step explanation:
x2-8x=9
x-6x=9
-5x=9
x=-5/9
(-5/9)(2)-8(-5/9)=3.33.. (3 and 1/3)
Answer:
So to maximize profit 24 downhill and 20 cross country shouldbe produced
Step-by-step explanation:
Let X be the number of downhill skis and Y the number of cross country skis.
Time required for manufacturing and finishing each ski are: manufacturing time per ski, downhill 2.5 hours, cross country 1.5 hours
Finishing time per ski: downhill 0.5 hours, cross country 1.5 hours.
Total manufacturing time taken = (2.5) x+ (1.5+) y = 2.5x+1.5y≤90
total finishing time taken = 0.5x+1.5 y≤42
Profit function
Z = 50x+50y
Objective is to maximize Z
Solving the two equations we get intersecting point is
(x,y) = (24,20)
In the feasible region corner points are (0.28) (36,0)
Profit for these points are
i) 2200 for (24,20)
ii) 1400 for (0,28)
iii) 1800 for (36,0)
So to maximize profit 24 downhill and 20 cross country shouldbe produced.
Answer:
Scalene triangle
Step-by-step explanation:
A scalene triangle is a triangle with three different side lengths and angle measures. Since none of the side lengths are the same length, then none of the angle measures are the same either leading the correct answer to be scalene.
Answer:
ok
Step-by-step explanation:
ok