Answer:
The equation for total cost function is
C(x)=100+270x
Step-by-step explanation:
Variable cost per per board =total cost per day-fixed cost per day/daily output
total cost per day is $5,500
fixed cost per day is $100
20 boards are produced per day
variable cost per board=($5,500-$100)/20=$270 per day
Total cost C(x)=fixed cost per day+ variable per board*number of daily output
Since daily output is represented also by x ,total cost function is given thus:
C(x)=100+270x
The length of extra cable that is required to connect the two pieces of existing cable is equal to 182 meters.
<h3>How to determine the length of extra cable?</h3>
In order to determine the length of extra cable that is required to connect the two pieces of existing cable, we would apply the law of cosine as follows:
B² = A² + C² - 2(A)(C)cosB
Substituting the given parameters into the formula, we have;
B² = 325.0² + 430.0² - 2(325.0)(430.0)cos23
B² = 105,625 + 184,900 - 279,500(0.9205)
B² = 290,525 - 257,279.75
B² = 33,245.25
B = √33,245.25
B = 182.33 ≈ 182 meters.
Read more on cosine law here: brainly.com/question/11000638
#SPJ1
Answer:
It falls between √7 and √8
Step-by-step explanation:
Please kindly check the attached file for explanation.
Answer:
12.7 degrees
Step-by-step explanation:
there are 180 degrees in a straight line, and since the angle opposite a is 167.3, we subtract that from 180 and we get 12.7
Answer:
tHE ANSWER IS 10X15
Step-by-step explanation:
10X15=150