C is 89 but I haven’t figured out the rest yet sorry
A+B+C = 180
62+95+Z = 180
157 + Z = 180
Z = 23
Answer:
17
Step-by-step explanation:
42+x=5x
-5 - 5
=17
Answer:
30 workers are required.
Step-by-step explanation:
If the site measured 30 acres and was completed in 10 days, then it can be said that on average
were made.
Then, 24 workers completed 3 acres / day.
Then, 
8 workers can complete 1 acre per day
Now to know how many workers are needed to complete 45 acres in 12 days, we multiply:
.
Finally, 30 workers are required.
To solve this problem it was assumed that everyone worked at the same pace, which may not be true, the fact that some work at a slower or faster pace than another could alter the result, causing them to finish less or more acres by day.
Answer:
V=pi x (r)^2 x h
V-volume r-radius h-height
V= pi x (3)^2 x 9
V= pi x 9 x 9
V= pi x 81
V= 254.47 (rounded)