1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Soloha48 [4]
3 years ago
5

A circular flower bed is 23 m in diameter and has a circular sidewalk around it that is 4 m wide. Find the area of the sidewalk

in square meters. Use 3.14 for π.
Mathematics
1 answer:
kiruha [24]3 years ago
8 0

Answer:  244.92 m

Step-by-step explanation:

The area of a circle is pir^2. First you will need to find the area of the concrete and subtract the area of the flower bed from that amount. The concrete is 3 feet wide so you will add that to 11.5 (half of the flower bed diameter) to find the radius. 14.5^2 pi is the entirety of the area. Then subtract 11.5^2 pi for the area of the concrete.

You might be interested in
M5_A3. The expected project completion time for the construction of a pressure vessel is 18 monthsand the project variance is 7.
snow_tiger [21]

Answer:

a) 0.3520

b) 0.9884

c) 0.1292

d) 0.1292

e) 0.7648

Step-by-step explanation:

Problems of normally distributed samples can be solved using the z-score formula.

In a set with mean \mu and standard deviation \sigma, the zscore of a measure X is given by

Z = \frac{X - \mu}{\sigma}

After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X.

In this problem, we have that:

The expected project completion time for the construction of a pressure vessel is 18 months. So \mu = 18.

And the project variance is 7. The standard deviation is the square root of the variance, so \sigma = \sqrt{7}.

a) What is the probability that the project will require at least 19 months?

The pvalue of the zscore of X = 19 is the probability that the project will require less than 19 months. So the probability that the project will require at least 19 months is the subtraction of 1 by this pvalue.

Z = \frac{X - \mu}{\sigma}

Z = \frac{19 - 18}{\sqrt{7}}

Z = 0.38

The pvalue of Z = 0.38 is 0.6480.

So the probability that the project will require at least 19 months is 1 - 0.6480 = 0.3520.

b) What is the probability that the project will be completed within 24 months?

This is the pvalue of the zscore of X = 24.

Z = \frac{X - \mu}{\sigma}

Z = \frac{24 - 18}{\sqrt{7}}

Z = 2.27

The pvalue of Z = 2.27 is .9884. This means that the probability that the project will be completed within 24 months is .9884.

c) What is the probability that the project will require at least 21 months?

Same logic as a). We find the pvalue of the zscore of X = 21, then we subtract 1 by this value.

Z = \frac{X - \mu}{\sigma}

Z = \frac{21 - 18}{\sqrt{7}}

Z = 1.13

The pvalue of Z = 1.13 is 0.8708.

So the probability that the project will require at least 21 months is 1 - 0.8708 = 0.1292.

d) What is the probability that the project will be completed within 15 months?

Same logic as b). This is the pvalue of the zscore of X = 15.

Z = \frac{X - \mu}{\sigma}

Z = \frac{15 - 18}{\sqrt{7}}

Z = -1.13

The pvalue of Z = -1.13 is .1292. This means that the probability that the project will be completed within 15 months is .1292.

e) What is the probability that the project will take between 16 and 24 months to complete?

This is the pvalue of Z = 24 subtract by the pvalue of Z = 16.

In b), we found that the pvalue of Z = 24 is .9884

Now we find the pvalue of Z = 16

Z = \frac{X - \mu}{\sigma}

Z = \frac{16 - 18}{\sqrt{7}}

Z = -0.76

The pvalue of Z = -0.76 is 0.2236

So the probability that the project will take between 16 and 24 months to complete is 0.9884 - 0.2236 = 0.7648

8 0
4 years ago
I need help with 3&4 plz
ira [324]

Answer:

-5 and 8

in question 3and 4 we have to evaluate

6 0
3 years ago
Tirzah wants to put a fence around her garden. She has 22 yards of fence material. Does she have enough to go all the way around
andrey2020 [161]

Answer:

No becasue she only has 22 yard and the total she needs is more than 23 yards

7 0
2 years ago
HELP ME PLEEEAASSEEE I SUCK AT MATH
irakobra [83]

Answer:

the answer is letter d

5 0
3 years ago
Read 2 more answers
PlZ, ANSWER I WILL MARK YOU BRAINLIEST AND GIVE YOUR 5 STARS!!!
BabaBlast [244]
Well to find the area of a triangle is 1/2 base times height
6 0
3 years ago
Read 2 more answers
Other questions:
  • A ball is thrown from an initial height of 6 feet with an initial upward velocity of 28/fts
    14·1 answer
  • Write a real-world problem that could be represented by the following equation. 70 + 5x = 40 + 10x
    12·1 answer
  • This is urgent please help!!
    15·1 answer
  • Is Taylor Swift dead​
    14·2 answers
  • What is the equation for a quadratic function
    11·1 answer
  • Help ASAP PLEASE ………..
    8·1 answer
  • Assignment
    6·1 answer
  • Yesterday, there were 60 problems assigned for math homework. Albert did 30% of them correctly. How many problems did Albert get
    12·1 answer
  • 16 teams qualify for a tournament. How many possible ways can the final game (2 teams) be played?
    5·1 answer
  • Simplify the expression:<br> 64 5/6
    13·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!