There are multiple critical paths
Explanation:
The critical path method (CPM), or critical path analysis (CPA), is an algorithm for scheduling a set of project activities. It is commonly used in conjunction with the program evaluation and review technique (PERT). A critical path is determined by identifying the longest stretch of dependent activities and measuring the time required to complete them from start to finish.
The essential technique for using CPM is to construct a model of the project that includes the following:
- A list of all activities required to complete the project (typically categorized within a work breakdown structure),
- The time (duration) that each activity will take to complete,
- The dependencies between the activities and,
- Logical end points such as milestones or deliverable items.
Using these values, CPM calculates the longest path of planned activities to logical end points or to the end of the project, and the earliest and latest that each activity can start and finish without making the project longer. This process determines which activities are "critical" (i.e., on the longest path) and which have "total float" (i.e., can be delayed without making the project longer).
considering the above function of the cpm analysis because you have multiple path, there is tendency that more than path through the project network will have zero slack values.
The plate can change the function that is in it. If you were to name it wrong, you would have to debug the code and possibly rewrite it.
A, B , and E sorry if I’m wrong
Answer:
Clipboard, Slides, Font, Paragraph, Drawing, and Editing
Answer:
The drill down term is basically used in the information technology for the explore the multidimensional information or data by navigating the different layers of the data from the web page applications.
Drill down basically involve in the database by accessing the specific information through the database queries. Each query basically increase the data granularity. This term is also involve with the link for represent the details more specifically.
The drill down is the simple approach or technique for dividing the complex problems into small parts so that it make the technique more efficient.