IgorC [24]
3 years ago
15

3.5 m

Mathematics
1 answer:
ser-zykov [4K]3 years ago
5 0

Circumference = 2 x pi x r

Circumference = 2 x 3.14 x 3.5m

Circumference = 21.98

Round to 22m

The answer is c. 22m

You might be interested in
Find the equation of the line in slope-intercept form<br><br> (4,-6) and no slope
marin [14]

Answer:

x=4

Step-by-step explanation:

No slope means slope is undefined --> you have vertical  line that passes through (4,-6), where x=4, y= -6

5 0
3 years ago
Percentage math problem.<br><br> Please help
Vinil7 [7]

Answer:

46%

Step-by-step explanation:

0.25 + 0.21 = 0.46

0.46 = 46%

7 0
3 years ago
Shawn and Ellie are construction workers. Shawn can complete a concrete job in 5 hours, while Ellie can complete it in 7 hours.
eimsori [14]

Step-by-step explanation:

We generally assume that when multiple resources are put on a job, the completion rate is the sum of the completion rates of the different resources. Rate is generally measured in units per time. Here, the appropriate "unit" is "job".

Step 1 is convert the hours per job to a rate in terms of jobs per hour.

... Shawn can complete 1/5 job per hour.

... Ellie can complete 1/7 job per hour.

Step 2 is to add the rates to get the total rate when both resources are applied.

... (1/5 job/h) + (1/7 job/h) = (7/35 +5/35) job/h = 12/35 job/h

Step 3 is to convert that rate back to the time require to complete one job. We can divide the work to be done (1 job) by the rate at which it is done in order to find the time required.

... (1 job)/(12/35 job/h) = 35/12 h = 2 11/12 hours = 2 hours 55 minutes

The foreman is incorrect.

_____

<em>Comment on the solution</em>

The time when workers work together will always be between the longest time divided by the number of workers (7/2 = 3.5 hours here) and the shortest time divided by the number of workers (5/2 = 2.5 hours here). Our answer of 2.92 hours is in that range.

The foreman should know better. (If s/he were to divide the average completion time (6 h) by the number of workers (2), s/he would have a guess of 3 hours—closer, but still incorrect.)

4 0
4 years ago
2x+3y=4<br><br>This is not slope btw 
viktelen [127]
When x=-4:
2(-4)+3y=4
3y=4+8
3y=12
y=4
So the ordered pair is (-4,4), I think

3 0
4 years ago
Read 2 more answers
Help
sdas [7]

I think the answer for this question is letter C: SAS

8 0
3 years ago
Other questions:
  • Jerry’s rhombus has a base of 15 inches and a height of 9 inches. Charlene’s rhombus has a base and a height that are 13 the bas
    14·2 answers
  • Ben can buy a package of 5 tshirts for 26.25 or a package of 3 tshirts for 14.25. what is the unit price per t-shirt in each pac
    5·1 answer
  • Obesity is a risk factor for many health problems such as type 2 diabetes, high blood pressure, joint problems, and gallstones.
    13·1 answer
  • What is the LCM of 3.6 and 4
    10·2 answers
  • The capacity of a small glass is 120mL. how many small glasses can be completely filled from a 2L pitcher of water?​
    6·2 answers
  • Bus A and Bus B leave the bus depot at 3 pm.
    8·1 answer
  • True or false statement?<br><br> -16 &gt; -f , if f = 15
    5·1 answer
  • a scientist has two solutions which she has labeled solutions A and solution B each contains salt. she knows that solution A is
    11·1 answer
  • Pls help me with this
    10·1 answer
  • Brittany is making party favors. She is dividing
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!