Answer:
$3.42
Step-by-step explanation:
Meters of material required = 1.2 meters
Cost per meter of material = $0.85
Direct labor hours = 0.1
Cost of direct labor per hour = $15
Overhead rate = $9 per direct labor hour
Standard cost per unit of product :
(Direct material cost per unit + direct labor cost per unit + overhead cost per unit)
Direct material cost per unit :
Material needed × cost per meter = (1.2 × $0.85) = $1.02
Direct labor cost per unit :
Direct labor hour × cost per hour = ( 0.1 × $15) = $1.5
Overhead cost:
0.1 * $9 = $0.9
Standard cost :
($1.02 + $1.5 + $0.9) = $3.42
Answer:
B. is the answer
hope this helps
have a good day
Step-by-step explanation:
5,998.7714 ft
Step-by-step explanation:
Well find x in the illustration;
First To find the opposite side of the right-angled triangle we'll using tangent of the given angle
Tangent Ф = Length of the opposite side / Length of the adjacent side
Tan 43 = h / 6390
h = Tan (43) * 6390
h = 5,958.7714 ft
Then we'll add the height of the beacon which is 40 ft above ground;
x = 5,958.7714 ft + 40 ft
x = 5,998.7714 ft
Learn More:
brainly.com/question/9683388
brainly.com/question/10685463
#LearnWithBrainly
Answer:
300 km
Step-by-step explanation:
3 hours and 45 minutes = 3
Speed = 80 km per hour.
80 × 3 = 240 km
80 × = 60
240 + 60 = 300
Answer:
y=6x+5
Step-by-step explanation: