Solve for X: 2.5x+12=32

Mathematics
1 answer:
Crank2 years ago
5 0

Step-by-step explanation:

2.5x+12=32

We move all terms to the left:

2.5x+12-(32)=0

We add all the numbers together, and all the variables

2.5x-20=0

We move all terms containing x to the left, all other terms to the right

2.5x=20

x=20/2.5

x=8

You might be interested in
Robert can paint a room in 6 hours. Julio can paint a room in 8 hours.how long will it take for the two of them to paint a room
Llana [10]

Roberto paints 1/6 of a room in 1 hour.
Julio paints1/8 of a room in 1 hour.

Working together, they paint (1/6 + 1/8) = (4/24 + 3/24) = 7/24 room per hour.

The reciprocal unit rate is  24/7 hour per room = <em>3-3/7 hours</em> per room.


6 0
3 years ago
Write an equation for the proportional relationship shown in the table
Papessa [141]

Answer:

y =74x

Step-by-step explanation:

A proportional relationship is represented by y = kx where x is the independent variable, or input, k is the constant of proportionality, and y is the dependent variable or output.

What do we do to the values in the row for x to get the values in the row of y?

It helps to have x = 1 in this table.

74 = (k)(1)

74 = k

8 0
2 years ago
a worker A finishes a project on his own in 12 days. the worker completes the same work alone in 16 days. the two workers starte
ankoles [38]

Answer:

<em>Worker B needs 9 days to finish the rest of the work</em>

Step-by-step explanation:

<u>Proportions</u>

Worker A finishes a project on his own in 12 days and worker B does the same in 16 days.

Worker A does 1/12 of the project in one day and worker B does 1/16 of the project in one day. When working together, they do

\frac{1}{12}+\frac{1}{16}=\frac{7}{48}

After 3 days they have completed:

3*\frac{7}{48}=\frac{7}{16}

parts of the project, this means it still remains:

1-\frac{7}{16}=\frac{9}{16}

parts of the project and it is done by B alone. Since B does \frac{1}{16} per day, he now takes

\displaystyle \frac{\frac{9}{16}}{\frac{1}{16}}=9

days to complete the project.

Worker B needs 9 days to finish the rest of the work

4 0
3 years ago
Use the graph to determine the input value for
musickatia [10]

Answer: x=1.5

Step-by-step explanation:

8 0
3 years ago
Rachel use a rectangular prism-shaped box to ship a package to her friend. What two-demintional figure form the faces on the box
lesya [120]
The two-dimensional figures would be;

Rectangles and Triangles

Rectangles would be front, back and bottom

Triangles would be the 2 right and left sides. 
4 0
3 years ago
Other questions:
  • Can someone please help me I really need help
    14·2 answers
  • There are 25 students. Average number of siblings for each student is 3. A new student with 8 siblings joins the class. The aver
    13·2 answers
  • Lauren, Rachel and Becca started a business over the summer. Their income was $500. The girls put in different amounts of work,
    13·1 answer
  • Find the slope of the parametric curve xequalsnegative 4 t cubed plus 8​, yequals5 t squared​, for negative infinity less than t
    8·1 answer
  • What is the answer please
    14·2 answers
  • What should be added to 66.778 get 78.2​
    15·1 answer
  • Please help!!! ASAP!!! Will give extra points!!!
    7·2 answers
  • If somebody can give me the answer!!! <br> Please I need help
    15·2 answers
  • Y=36x what is the slope
    12·1 answer
  • Factor 3x2 + 42x + 147 completely.
    13·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!