Twelve men take 6 hours to finish a piece of work.
In 1 hour, the 12 men will finish 1/6 of the work
( 1 job ) / ( 6 hrs ) = ( 1/6 of a job ) / ( 1 hr )
-----------------------------------------
That means there is of the job
left to do.
-------------------
If 12 men take 6 hours to finish a piece of work,
1 man will take 12 times as long, to finish the work, so
( 1 job ) / ( 6*12 = 72 hrs ) = rate of working for 1 man, or
-------------------
After 1 hour, there are a total of men working
20 men will work 20 times as fast as 1 man on the
of a job that remains, so
Let = hours for the 20 men to finish the job
Answer:
x = 21.2 ft
Step-by-step explanation:
x = tanФ h
h = 50
Ф = 23°
x = tan(23°) * 50
x = 21.2 ft
Parallel lines share the same slope. y=3x+7 has a slope of 3, so that is the slope of the parallel line. Then use y=mx+b an plug in (2,4).
y=3x+b
4=3(2)+b
4=6+b
b=-2
So the equation is y=3x-2
Answer:
the answer is Solve for the first variable in one of the equations, then substitute the result into the other equation.
Point Form:
(−17/2, -7)
Equation Form:x=-17/2 y=-7
Answer: Answer: x^2 - 1 is not a polynomial as after simplifying it there will be no variable.
Step-by-step explanation: