Answer:
The answer is below
Step-by-step explanation:
a) Cost of hiring the bicycle for 14 days is:
Cost = 65 * 14 days + 44 = 954 riyals
b) The number of days the bicycle is hired is to be the same as the number of days the bicycle is to be hired. Let us assume that the bicycle and helmet is to be hired for x days, hence:
Cost of bicycle = 65 * x + 14 = 65x + 44
Cost of helmet = 12.5 * x = 12.5x
Total cost = 65x + 44 + 12.5x = 77.5x + 44
Since 750 riyals is available, hence:
750 = 77.5x + 44
77.5x = 706
x = 9.11
Therefore the maximum number of days is 11. The total cost for 11 days is:
Total cost = 77.5(9) + 44 = 741.5 riyals
Money not spent = 750 riyals - 741.5 riyals = 8.5 riyals
-1+3m=2m+4
put the like terms together
3m-2m=4+1
m=5
Answer:
-2/3
Step-by-step explanation:
<span>The volume of each celluloid die is (.25 x .25 x .25) = 0.015625 cubic inch.
To manufacture 24,000 of them, you need to start with <u>at least</u>
(24,000) x (0.015625) = <u>375 cubic inches</u>.
I don't know how celluloid is sold, so you should also keep in mind that
375 cubic inches = about 207.8 fluid ounces, or about 6.5 quarts.
I'm sure a bit more than that was used in the manufacture, since
there's always some wasted, spilled, or trimmed off of the edges. </span>