1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
svlad2 [7]
3 years ago
6

Does anybody know what measures a, b, and c would be?

Mathematics
1 answer:
Mumz [18]3 years ago
3 0

Answer: A = 28 B = 47 C = 105 in degrees

Step-by-step explanation:

OKAY JUST A DISCLAIMER:

I did Geometry last year and the concepts are basically gone but I think I remember how to do this one

So I think one of the theorems stated that the inner angle is half of the outer arc.

So.. angle a would be 56/2 = 28

Angle b would be 94/2 = 47

Angle C is a vertical angle to the angle in the triangle, so it would be 180-47-28=105

You might be interested in
What’s 7/10 Equivalent to put it in fraction
Alina [70]

Answer:

i think this is what u want

Step-by-step explanation:

please mark brainliest

4 0
3 years ago
Read 2 more answers
How many dimes in 1898.59
Keith_Richards [23]
All you do is divide by 10

there are 189 whole dimes
5 0
4 years ago
Read 2 more answers
Please answer this what is the answer to this question now
Tanya [424]

Answer:

19

Step-by-step explanation:

M is the center of the triangle, means that MR=MQ=PM

and M is the in center of the triangle=MS=MT=MU=19

8 0
3 years ago
john needed 13.71 feet of wire to fix a lamp he bought 14 half feet of wire how much did he have left ver​
motikmotik
<h3>♫ - - - - - - - - - - - - - - - ~Hello There!~ - - - - - - - - - - - - - - - ♫</h3>

➷ Just subtract the two values:

14.5 - 13.71 = 0.79

He had 0.79 feet of wire left

<h3><u>✽</u></h3>

➶ Hope This Helps You!

➶ Good Luck (:

➶ Have A Great Day ^-^

↬ ʜᴀɴɴᴀʜ ♡

8 0
4 years ago
Read 2 more answers
A can do a piece of work in 4 hours and B can do it in 6 hours. How much time would they take working together to finish the wor
Kipish [7]

Answer:

2.4 hours

Step-by-step explanation:

Let total work = X

Rate of work done = X ÷ time

Rate of A = X/4

Rate of B = X/6

If they work together, rate is the sum of their individual rates, i.e.

X/4 + X/6

= (3X + 2X)/12 (taking LCM)

=5X/12

Rate = X/time

5X/12 = X/time

time = X÷(5X/12)

time = X × 12/(5X)

time = 2.4 hours

Shortcut:

Product of individual times/sum of individual times

= (4×6)/(4+6)

=24/10

=2.4 hours

8 0
4 years ago
Read 2 more answers
Other questions:
  • You deposit $1600 in an account. The annual interest rate is 5% for 3 years. How much
    10·1 answer
  • What is the length of SR ?<br><br><br> 9 units<br> 12 units<br> 15 units<br> 18 units
    13·1 answer
  • A plane is defined as what type of figure? A. 1-dimensional B. 2-dimensional C. 3-dimensional D. A plane has no dimensions.
    12·1 answer
  • If the density of iron is 7.8 g/cm3 and you find an iron nail weighing 15g, what would the volume of the nail be?
    5·2 answers
  • Write an equation to represent the following statement.
    10·1 answer
  • The street signs in a subdivision are in the shape of
    9·1 answer
  • Finding area of triangles
    5·1 answer
  • 5. Consider the contexts the follow.
    10·1 answer
  • Find the slope that passes through the points given in the table
    11·1 answer
  • Find the least common denominator of 11/10 and 1/15
    10·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!