Answer:
3 days
Step-by-step explanation:
This can be seen under Schedule management (Initiating)
Project float is simply the difference between the completion period externally imposed and the estimated time duration of the project (usually this is equal to the critical path length). The difference in this case is 0 because
Externally imposed project date = 75 days
Estimated duration of project = 75 days
Hence, a difference in these will be 0
However, a standard deviation of 3 days was giving (This implies that there is a +/- 3 days in the critical path from the estimated project duration)
.
Hence the maximum float in this case will be 0 + 3 = 3 days
9514 1404 393
Answer:
139.39 in
Step-by-step explanation:
The length of a semicircle of diameter D is ...
C = (1/2)πD
For the given diameter of 27 inches, the length of the curved edge of the figure is ...
C = 1/2(3.14)(27 in) = 42.39 in
__
The perimeter of the figure is the sum of the side lengths. Clockwise from left, that sum is ...
P = 27 + 35 + 42.39 + 35 = 139.39 . . . inches
The perimeter of the figure is 139.39 inches.
Answer:
it's 42 my bad...
Step-by-step explanation:
Answer: D (-∞, ³⁄₂)
1. Find non - negative values for radicals. x ≤ ³⁄₂
2. Find undefined (singularity) points. x = ³⁄₂
3. Combine real regions and undefined points for final domain.
Final answer: x < ³⁄₂