1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Alex_Xolod [135]
3 years ago
14

What’s the correct answer for this question?

Mathematics
1 answer:
Ronch [10]3 years ago
8 0
Hopes this helps:

Answer: D.

1. Simplify 12/18 to 2/3.
2/3 = 16/24


2. Simplify 16/24 to 2/3.
2/3 = 2/3


3. Some both sides equal, there are infinitely many solutions.
You might be interested in
Sylvanite is a mineral that contains 28.0% gold by mass. Determine how much sylvanite would you need to dig up to obtain 81.0 g
lidiya [134]
Since Sylvanite only contains 28% gold by mass, then to obtain 81.0 grams of gold, x amounts of sylvanite must be mined. To determine x, we divide 81 grams by 28%. This equation is shown below:

0.28X = 81

X = 81/0.28
X = 289.29 grams

Therefore, 289.29 grams of sylvanite must be dug up to obtain 81 grams of gold.
3 0
3 years ago
Without multiplying determine the sign of the product (-468,256)(183,758).​
maxonik [38]

Answer:

negative

Step-by-step explanation:

rules:

+ + = +

- - = +

+ - = -

- + = -    ----> (-468,256)(183,758)

3 0
2 years ago
What are 2 ways to solve the problem 9×1×5 = ?
aliina [53]
2ways you can solve that is by multiplying 9 by 1 then by 5 or 9by 5 then by 1
6 0
3 years ago
Identify the graph of (x+3)^2 - 4y for T(-7,2) and write and equation of the translated or rotated graph in general form.
Firlakuza [10]

Answer:

Step-by-step explanation:

C

4 0
3 years ago
One student can paint a wall in 16 minutes. Another student can paint the same wall in 24 minutes. Working together, about how l
Mazyrski [523]
Let's look at work rates per minute.

Together they can paint the wall in x minutes.
Working together, in 1 minute, they do 1/x of the job.

The student who paints the wall in 16 minutes does 1/16 of the job in 1 minute.
The student who paints the wall in 24 minutes does 1/24 of the job in 1 minute.
Together, they do 1/16 + 1/24 of the job in 1 minute, but from above, we see that together, they do 1/x of the job in 1 minute, so 1/16 + 1/24 must equal 1/x. That gives us our equation.

1/16 + 1/24 = 1/x

1/16 * 3/3 + 1/24 * 2/2 = 1/x

3/48 + 2/48 = 1/x

5/48 = 1/x

x = 48/5 = 9.6

Answer: It takes them 9.6 minutes, or about 10 minutes to do the job together.


5 0
3 years ago
Other questions:
  • You work at a local grocery store. Your paychecks over the past 6 weeks were $56.05, $41.50, $22.50, $52.90, $49.85 and $31.00.
    6·1 answer
  • Let f(x)=15/(1+4e^(-0.2x)
    14·1 answer
  • Find the product: (74.862)(5.901
    10·1 answer
  • Simplify the expression. (2x^2y)^3
    6·2 answers
  • Find the area of the shape shown below.<br> 2<br> 2<br> 4<br> Hurry and answer plz!!!!<br> 1
    13·1 answer
  • The second term of an arithmetic sequence is 7. The sum of the first four terms of the sequence is 12. Find the first term, a, a
    7·2 answers
  • In math what is the answer to this question. -27•7/9=
    8·1 answer
  • Suppose a fair six sided die has been relabeled so that the 6 is replaced with another 5,i.e., the sides read 1,2,3,4,5,5. If th
    11·1 answer
  • PLEASE HELP QUICK!!!!!!!! WILL GIVE BRAINIEST!!!!!!!!!
    13·1 answer
  • REPOST !!!! Write a proportion using an unknown value x and the ratio 5 : 6. Then solve it.
    15·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!